Bollard Installers

Armagh City, Banbridge and Craigavon · Northern Ireland

Bollard removal in Portadown

Bollard removal jobs for sites across Portadown and the rest of Armagh City, Banbridge and Craigavon, from the first measurement to the last relaid paving block.

Neat excavation in block paving where a bollard was removed, the old post and concrete root lying beside it, cones and barrier aroundComputer-generated image

Bollard removal in Portadown

Across Portadown, typical sites for bollard removal jobs include community car parks, community buildings and small industrial units. Posts can be cut off at or below ground level or fully extracted with their concrete.

We cover every part of Portadown in the BT62 and BT63 postcode districts. We also cover neighbouring Craigavon (2.8 miles), Banbridge (8.2 miles), Armagh (10.3 miles) and Dungannon (14.1 miles) — distances are straight-line. Belfast is around 24 miles away.

Portadown at a glance

Roads authority
the Department for Infrastructure (DfI Roads)
Planning authority
Armagh City, Banbridge and Craigavon Borough Council
Postcodes
BT62 and BT63
Guide price
Typically £80–£335 per post + VAT (£95–£395 inc VAT for homes); minimum job £285
Survey
Free, with a fixed written quote
Nearby
Craigavon (2.8 mi), Banbridge (8.2 mi), Armagh (10.3 mi), Dungannon (14.1 mi)

Common reasons for bollard removal jobs in Portadown

Why sites in Portadown book bollard removal jobs:

  • Access routes no longer needing control
  • Car park and forecourt redesigns
  • Removing redundant lighting bollards

Guide prices for Portadown

SpecificationGuide priceIncludes
Standard£80–£185 + VAT · £95–£215 inc VATPost out, hole backfilled, simple surface
Upgraded£155–£265 + VAT · £185–£315 inc VATFooting removed, tarmac or block paving reinstated
Premium£235–£335 + VAT · £275–£395 inc VATLarge footing, concrete or natural stone reinstated

Per post removed with footing, surface made good; -2% for Northern Ireland. Guide only — the fixed price follows a survey.

Permissions and groundwork in Portadown

Across Northern Ireland the Department for Infrastructure's DfI Roads is the roads authority, so bollards on a public footway or road in Portadown need its agreement before anything is dug. Posts on your own land do not.

Planning in Northern Ireland sits with the councils, so for a listed building or conservation area in Portadown the planning team at Armagh City, Banbridge and Craigavon Borough Council is the one to ask before posts go in.

Foundations are rarely the size anyone expects. Backfilling in compacted layers stops later settlement, which otherwise shows as a dip in the new surface.

  • Check whether the bollards were required by a planning condition, lease, security plan or DfI Roads before removing them.
  • Have automatic and lighting bollard supplies isolated and made safe by a qualified electrician.

What happens on site

Survey what is in the ground

The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.

Remove posts and foundations

Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.

Backfill and reinstate

Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.

Choosing the right spec

OptionDetail
RelocationCareful removal of reusable posts and reinstallation in new positions on the same site.
Socket and cassette removalRemovable sockets and telescopic or semi-automatic cassettes extracted whole and the hole filled.
Cut off below surfacePost removed at or below finished level, foundation left in place and the surface patched. Quick and low-disruption.

What affects the quote

Our Northern Ireland guide prices are a starting point; the survey in Portadown firms them up. What tends to move them:

  • Size of foundations and amount of spoil
  • Access, working hours and waste disposal
  • Surface type and reinstatement

After installation

If foundations were left in place, record their positions on site drawings so future contractors are not surprised by buried concrete. Where cables were terminated rather than removed, record where they are and confirm with the electrician that they are dead and labelled.

For damaged or loose posts in Portadown, repairs and replacements are priced in writing first.

Common questions

Which parts of Portadown do you cover for bollard removal jobs?

We cover all of Portadown (BT62 and BT63) and the rest of Armagh City, Banbridge and Craigavon. We also work in Craigavon, Banbridge and Armagh.

Do I need consent for bollards on a public footway in Portadown?

Across Northern Ireland the Department for Infrastructure's DfI Roads is the roads authority, so bollards on a public footway or road in Portadown need its agreement before anything is dug. Posts on your own land do not.

How much do bollard removal jobs cost in Portadown?

In Portadown, typically £80–£335 per post removed with footing, surface made good, plus VAT (£95–£395 including VAT for homeowners), with a minimum job of £285 plus VAT, using our Northern Ireland guide prices. The fixed figure comes in writing after we've seen the site.

Can automatic bollards be removed safely?

Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.

Will the surface look patched after removal?

On block paving it can be nearly invisible, as the blocks are relaid. Tarmac, resin and concrete usually show a patch, especially on older weathered surfaces. Timing removal before resurfacing avoids that.

Bollard removal near Portadown

Other bollard services in Portadown

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote