England · 12 towns
Bollard removal in Derbyshire
Bollard removal for sites across Derbyshire: surveyed, quoted in writing and installed by our crews.
Computer-generated imageBollard removal in Derbyshire
Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match. We cover Derbyshire — Derby, Chesterfield, Long Eaton, Ilkeston and Swadlincote and more.
Highway authorities for local roads in Derbyshire: Derby City Council and Derbyshire County Council.
Choose your town in Derbyshire
Guide prices in Derbyshire
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £80–£185 + VAT · £95–£215 inc VAT | Post out, hole backfilled, simple surface |
| Upgraded | £155–£265 + VAT · £185–£315 inc VAT | Footing removed, tarmac or block paving reinstated |
| Premium | £235–£335 + VAT · £275–£395 inc VAT | Large footing, concrete or natural stone reinstated |
Per post removed with footing, surface made good; -2% for East Midlands. Guide only — the fixed price follows a survey.
Local authorities across Derbyshire
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Derby | Derby City Council | Derby City Council |
| Chesterfield | Derbyshire County Council | the council for Chesterfield |
| Long Eaton | Derbyshire County Council | the council for Erewash |
| Ilkeston | Derbyshire County Council | the council for Erewash |
| Swadlincote | Derbyshire County Council | the council for South Derbyshire |
| Staveley | Derbyshire County Council | the council for Chesterfield |
| Belper | Derbyshire County Council | the council for Amber Valley |
| Heanor | Derbyshire County Council | the council for Amber Valley |
| Alfreton | Derbyshire County Council | the council for Amber Valley |
| Dronfield | Derbyshire County Council | the council for North East Derbyshire |
| Ripley | Derbyshire County Council | the council for Amber Valley |
| Buxton | Derbyshire County Council | the council for High Peak |
Rules for bollard removal jobs in England
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first.
Details and sources: bollard rules in England.
How installation works
Survey what is in the ground
The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.
Check consents and reasons
Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.
Make supplies safe
For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.
Remove posts and foundations
Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.
Bollard removal in Derbyshire: FAQs
Do you cover all of Derbyshire for bollard removal jobs?
Yes — including Derby, Chesterfield, Long Eaton, Ilkeston, Swadlincote, Staveley, Belper and Heanor. Enter your postcode in the price calculator to confirm.
How much do bollard removal jobs cost in Derbyshire?
In Derbyshire, typically £80–£335 per post removed with footing, surface made good, plus VAT (£95–£395 including VAT for homeowners), with a minimum job of £285 plus VAT, using our East Midlands guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in Derbyshire?
For local roads, Derby City Council and Derbyshire County Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.
Can automatic bollards be removed safely?
Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.
Can removed bollards be reused elsewhere on site?
Often, if they come out undamaged. Steel posts and removable bollards relocate well. New foundations are formed at the new positions.