Northern Ireland · 2 towns
Bollard removal in Fermanagh and Omagh
Bollard removal for sites across Fermanagh and Omagh: surveyed, quoted in writing and installed by our crews.
Computer-generated imageBollard removal in Fermanagh and Omagh
We supply and install bollard removal jobs across Fermanagh and Omagh, with local pages for 2 towns below. Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match.
Across Northern Ireland, DfI Roads (the Department for Infrastructure) is the roads authority for public roads and footways; councils handle planning.
Choose your town in Fermanagh and Omagh
Guide prices in Fermanagh and Omagh
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £80–£185 + VAT · £95–£215 inc VAT | Post out, hole backfilled, simple surface |
| Upgraded | £155–£265 + VAT · £185–£315 inc VAT | Footing removed, tarmac or block paving reinstated |
| Premium | £235–£335 + VAT · £275–£395 inc VAT | Large footing, concrete or natural stone reinstated |
Per post removed with footing, surface made good; -2% for Northern Ireland. Guide only — the fixed price follows a survey.
Highway and planning authorities in Fermanagh and Omagh
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Omagh | the Department for Infrastructure (DfI Roads) | Fermanagh and Omagh District Council |
| Enniskillen | the Department for Infrastructure (DfI Roads) | Fermanagh and Omagh District Council |
Rules for bollard removal jobs in Northern Ireland
Bollards on public footways and roads need DfI Roads consent under the Roads (NI) Order 1993; councils deal with planning. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first.
Details and sources: bollard rules in Northern Ireland.
How installation works
Survey what is in the ground
The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.
Make supplies safe
For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.
Remove posts and foundations
Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.
Backfill and reinstate
Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.
Bollard removal in Fermanagh and Omagh: FAQs
Do you cover all of Fermanagh and Omagh for bollard removal jobs?
Yes — including Omagh and Enniskillen. Enter your postcode in the price calculator to confirm.
How much do bollard removal jobs cost in Fermanagh and Omagh?
In Fermanagh and Omagh, typically £80–£335 per post removed with footing, surface made good, plus VAT (£95–£395 including VAT for homeowners), with a minimum job of £285 plus VAT, using our Northern Ireland guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in Fermanagh and Omagh?
DfI Roads (the Department for Infrastructure) is the roads authority for public roads and footways throughout Northern Ireland; councils handle planning.
Can automatic bollards be removed safely?
Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.
Should bollards be cut off or fully removed?
Cut off if the area is staying as it is and nothing will be built or dug there later. Fully remove if you are resurfacing, planting or installing something new, because buried concrete gets in the way. The quote can price both.