England · 4 towns
Bollard replacement in Wiltshire
Bollard replacement for sites across Wiltshire: surveyed, quoted in writing and installed by our crews.
Computer-generated imageBollard replacement in Wiltshire
Like-for-like or upgraded replacement of bollards damaged by vehicles, corrosion or wear, matched to the existing line. We cover Wiltshire — Swindon, Salisbury, Trowbridge and Chippenham.
Highway authorities for local roads in Wiltshire: Swindon Council and Wiltshire Council.
Choose your town in Wiltshire
Guide prices in Wiltshire
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £215–£625 + VAT · £255–£745 inc VAT | Standard post, foundation, reinstatement |
| Upgraded | £505–£925 + VAT · £605–£1,095 inc VAT | Upgraded finish or fittings, reflective band, matched keys |
| Premium | £805–£1,195 + VAT · £965–£1,445 inc VAT | Heavy-duty or architectural spec, premium finish |
Per post replaced, old post and footing removed; no regional adjustment. Guide only — the fixed price follows a survey.
Highway and planning authorities in Wiltshire
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Swindon | Swindon Council | Swindon Council |
| Salisbury | Wiltshire Council | Wiltshire Council |
| Trowbridge | Wiltshire Council | Wiltshire Council |
| Chippenham | Wiltshire Council | Wiltshire Council |
Rules for replacement bollards in England
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first.
Details and sources: bollard rules in England.
How installation works
Make safe
If a broken post or stub is a hazard, it can be removed or capped first. That is priced separately in writing so you can approve it on its own.
Survey and match
At the free site survey we measure the existing bollards, photograph the line and check the foundations. A fixed written quote sets out like-for-like and any upgrade options.
Remove the old bollard
The damaged post is cut or extracted and the old foundation broken out, checking for services as the hole is opened.
Install the new post
The new bollard is set in a fresh foundation, aligned with its neighbours and the surface is reinstated to match.
Bollard replacement in Wiltshire: FAQs
Do you cover all of Wiltshire for replacement bollards?
Yes — including Swindon, Salisbury, Trowbridge and Chippenham. Enter your postcode in the price calculator to confirm.
How much do replacement bollards cost in Wiltshire?
In Wiltshire, typically £215–£1,195 per post replaced, old post and footing removed, plus VAT (£255–£1,445 including VAT for homeowners), with a minimum job of £445 plus VAT, using our South West guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in Wiltshire?
For local roads, Swindon Council and Wiltshire Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.
What happens to the old bollard?
It is taken away with the broken-out concrete. Steel and iron are recycled where possible. Original heritage bollards can be returned to you if you want to keep them.
Can you replace just one bollard in a line?
Yes. We measure and match the existing posts so the new one sits in line at the same height and finish. If the original product is no longer made, we show you a close equivalent first.