Northern Ireland · 2 towns
Crash-rated bollard installation in Causeway Coast and Glens
Crash-rated bollards for sites across Causeway Coast and Glens: surveyed, quoted in writing and installed by our crews.
Computer-generated imageCrash-rated bollards in Causeway Coast and Glens
Installation of impact-tested HVM bollards rated to ISO 22343-1 (or the superseded, still-accepted PAS 68 / IWA 14-1) on the tested foundation. We cover Causeway Coast and Glens — Coleraine and Limavady.
Across Northern Ireland, DfI Roads (the Department for Infrastructure) is the roads authority for public roads and footways; councils handle planning.
Choose your town in Causeway Coast and Glens
Guide prices in Causeway Coast and Glens
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £1,945–£5,245 + VAT | Rated for a 7.5 t vehicle at 30 mph (48 km/h), tested foundation |
| Upgraded | £4,295–£7,595 + VAT | Rated for 7.5 t at 40 mph (64 km/h), tested foundation |
| Premium | £6,645–£9,795 + VAT | Rated for 7.5 t at 50 mph (80 km/h), or a specialist foundation |
Per bollard, supplied and installed on a standard tested foundation; -2% for Northern Ireland. Guide only — the fixed price follows a survey.
Local authorities across Causeway Coast and Glens
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Coleraine | the Department for Infrastructure (DfI Roads) | Causeway Coast and Glens Borough Council |
| Limavady | the Department for Infrastructure (DfI Roads) | Causeway Coast and Glens Borough Council |
Rules for crash-rated bollards in Northern Ireland
Bollards on public footways and roads need DfI Roads consent under the Roads (NI) Order 1993; councils deal with planning. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first. Crash ratings (ISO 22343-1, or the superseded but still accepted PAS 68 and IWA 14-1) only hold when the product is installed to its tested foundation.
Details and sources: bollard rules in Northern Ireland.
How installation works
Start from the specification
We work from the specification issued by your security adviser or the manufacturer: product, rating, positions and foundation drawing. If no specification exists yet, we can put you in touch with the manufacturer's technical team, but we do not set the threat level ourselves.
Free site survey and ground checks
A free site survey looks at access, surfaces and likely services, followed by utility searches, radar scanning and trial holes where needed. You then receive a fixed written quote based on what the survey found.
Set out and excavate
Positions are set out to the drawing and excavated to the tested depth and width, with shoring where the ground needs it. Spoil is removed as work progresses.
Hand over a build record
You receive photographs of the reinforcement and excavation before each pour, concrete delivery tickets, as-built positions and the manufacturer's product certification, ready for your adviser and insurers.
Crash-rated bollards in Causeway Coast and Glens: FAQs
Do you cover all of Causeway Coast and Glens for crash-rated bollards?
Yes — including Coleraine and Limavady. Enter your postcode in the price calculator to confirm.
How much do crash-rated bollards cost in Causeway Coast and Glens?
In Causeway Coast and Glens, typically £1,945–£9,795 per bollard, supplied and installed on a standard tested foundation, plus VAT, with a minimum job of £3,895 plus VAT, using our Northern Ireland guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in Causeway Coast and Glens?
DfI Roads (the Department for Infrastructure) is the roads authority for public roads and footways throughout Northern Ireland; councils handle planning.
When can we rely on the new bollards?
Only once the concrete has reached the strength set in the specification. The posts are physically in place as soon as the pour is finished, but the rated performance depends on the foundation, and full design strength is commonly taken at around 28 days. Your adviser may arrange temporary measures to cover the gap.
What happens if a rated bollard is struck?
Make the area safe and have the post assessed before relying on it again. A rated bollard that has absorbed a serious impact is usually replaced, and the manufacturer may need to check the foundation or insert. We can install the replacement to the original tested detail.