Crash-rated bollards in Hertfordshire

Across Hertfordshire, typical sites for crash-rated bollards include leisure centres, industrial estates and college campuses. Installation of impact-tested HVM bollards rated to ISO 22343-1 (or the superseded, still-accepted PAS 68 / IWA 14-1) on the tested foundation.

Highway authorities for local roads in Hertfordshire: Hertfordshire County Council.

Choose your town in Hertfordshire

Guide prices in Hertfordshire

SpecificationGuide priceIncludes
Standard£2,045–£5,495 + VATRated for a 7.5 t vehicle at 30 mph (48 km/h), tested foundation
Upgraded£4,545–£7,995 + VATRated for 7.5 t at 40 mph (64 km/h), tested foundation
Premium£6,995–£10,295 + VATRated for 7.5 t at 50 mph (80 km/h), or a specialist foundation

Per bollard, supplied and installed on a standard tested foundation; +3% for East of England. Guide only — the fixed price follows a survey.

Highway and planning authorities in Hertfordshire

TownHighway / roads authorityPlanning authority
WatfordHertfordshire County Councilthe council for Watford
Hemel HempsteadHertfordshire County Councilthe council for Dacorum
StevenageHertfordshire County Councilthe council for Stevenage
St AlbansHertfordshire County Councilthe council for St Albans
Welwyn Garden CityHertfordshire County Councilthe council for Welwyn Hatfield
CheshuntHertfordshire County Councilthe council for Broxbourne
HatfieldHertfordshire County Councilthe council for Welwyn Hatfield
Bishop's StortfordHertfordshire County Councilthe council for East Hertfordshire
BorehamwoodHertfordshire County Councilthe council for Hertsmere
HitchinHertfordshire County Councilthe council for North Hertfordshire
HoddesdonHertfordshire County Councilthe council for Broxbourne
Letchworth Garden CityHertfordshire County Councilthe council for North Hertfordshire
HarpendenHertfordshire County Councilthe council for St Albans
BusheyHertfordshire County Councilthe council for Hertsmere
HertfordHertfordshire County Councilthe council for East Hertfordshire
RickmansworthHertfordshire County Councilthe council for Three Rivers
Potters BarHertfordshire County Councilthe council for Hertsmere
BerkhamstedHertfordshire County Councilthe council for Dacorum

Rules for crash-rated bollards in England

Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first. Crash ratings (ISO 22343-1, or the superseded but still accepted PAS 68 and IWA 14-1) only hold when the product is installed to its tested foundation.

Details and sources: bollard rules in England.

How installation works

Start from the specification

We work from the specification issued by your security adviser or the manufacturer: product, rating, positions and foundation drawing. If no specification exists yet, we can put you in touch with the manufacturer's technical team, but we do not set the threat level ourselves.

Set out and excavate

Positions are set out to the drawing and excavated to the tested depth and width, with shoring where the ground needs it. Spoil is removed as work progresses.

Fix reinforcement and set the posts

The reinforcement cage is built to the drawing and the bollards are held to line and level in templates. Concrete is poured to the specified grade, with samples taken for testing if the specification calls for them.

Cure, protect and reinstate

The posts are protected while the concrete gains strength, and the surface is reinstated to match. The line should not be treated as fully effective until the specified curing period has passed.

Crash-rated bollards in Hertfordshire: FAQs

Do you cover all of Hertfordshire for crash-rated bollards?

Yes — including Watford, Hemel Hempstead, Stevenage, St Albans, Welwyn Garden City, Cheshunt, Hatfield and Bishop's Stortford. Enter your postcode in the price calculator to confirm.

How much do crash-rated bollards cost in Hertfordshire?

In Hertfordshire, typically £2,045–£10,295 per bollard, supplied and installed on a standard tested foundation, plus VAT, with a minimum job of £4,095 plus VAT, using our East of England guide prices. The fixed figure comes in writing after we've seen the site.

Who do I ask about bollards on public land in Hertfordshire?

For local roads, Hertfordshire County Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.

Will you design our HVM layout?

No. Scheme design and threat assessment belong with your security adviser, a specialist consultant or the manufacturer's technical team. We install the products they specify, to the tested foundation, and work alongside them on site so the build matches the design.

What does a crash rating code actually tell me?

It tells you the vehicle used in the test, how fast it was travelling, the angle it hit at and how far it got past the bollard line. Your security adviser compares those figures with the vehicle and speed achievable on your approach. A rating that does not match the site's real risk is either more than you need or not enough.

Other services in Hertfordshire

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote