England · 4 towns
Flexible bollard installation in East Riding of Yorkshire
Flexible bollards for sites across East Riding of Yorkshire: surveyed, quoted in writing and installed by our crews.
Computer-generated imageFlexible bollards in East Riding of Yorkshire
Polyurethane and spring-based bollards that bend when hit and return upright, for car parks, depots and lane separation. We cover East Riding of Yorkshire — Hull, Bridlington, Beverley and Goole.
Highway authorities for local roads in East Riding of Yorkshire: East Riding of Yorkshire Council and Hull City Council.
Choose your town in East Riding of Yorkshire
Guide prices in East Riding of Yorkshire
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £185–£355 + VAT | Standard post, foundation, reinstatement |
| Upgraded | £305–£465 + VAT | Upgraded finish or fittings, reflective band, matched keys |
| Premium | £425–£575 + VAT | Heavy-duty or architectural spec, premium finish |
Per bollard, supplied and fixed; -3% for Yorkshire and the Humber. Guide only — the fixed price follows a survey.
Highway and planning authorities in East Riding of Yorkshire
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Hull | Hull City Council | Hull City Council |
| Bridlington | East Riding of Yorkshire Council | East Riding of Yorkshire Council |
| Beverley | East Riding of Yorkshire Council | East Riding of Yorkshire Council |
| Goole | East Riding of Yorkshire Council | East Riding of Yorkshire Council |
Rules for flexible bollards in England
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first. Accessibility guidance asks for posts at least 1,000 mm high with contrasting tops and no chains between them.
Details and sources: bollard rules in England.
How installation works
Survey traffic movements
The free site survey looks at vehicle sizes, turning paths and where drivers currently clip posts or kerbs. You receive a fixed written quote with post type and fixing.
Check the surface
Slabs and decks are checked for thickness, reinforcement and waterproofing before drilling. Weak tarmac may need a concrete pad or socket base.
Set out the line
Posts are set out to guide vehicles along the intended path, with spacing that reads as a line to drivers.
Fix the bases
Holes are drilled and cleaned, resin anchors or bolts are set and the bases fixed and torqued once cured. Socket bases are set flush in concrete.
Flexible bollards in East Riding of Yorkshire: FAQs
Do you cover all of East Riding of Yorkshire for flexible bollards?
Yes — including Hull, Bridlington, Beverley and Goole. Enter your postcode in the price calculator to confirm.
How much do flexible bollards cost in East Riding of Yorkshire?
In East Riding of Yorkshire, typically £185–£575 per bollard, supplied and fixed, plus VAT, with a minimum job of £425 plus VAT, using our Yorkshire and the Humber guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in East Riding of Yorkshire?
For local roads, East Riding of Yorkshire Council and Hull City Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.
How many times can a flexible bollard be hit?
Many times in normal use, as long as the impacts are the low-speed bumps it is designed for. A heavy vehicle running right over it, or a high-speed strike, can tear it. Manufacturers give guidance for their products.
Do flexible bollards work in cold weather?
They do, but polymers become stiffer in cold conditions and recover more slowly after a knock. Sprung-base designs are less affected. Neither type is damaged by normal UK winter temperatures.