England · 10 towns
Shallow-mount security bollard installation in Berkshire
Shallow-mount bollards for sites across Berkshire: surveyed, quoted in writing and installed by our crews.
Computer-generated imageShallow-mount bollards in Berkshire
We supply and install shallow-mount bollards across Berkshire, with local pages for 10 towns below. Rated shallow-foundation bollard systems installed where buried services, basements or slabs rule out deep excavation.
Highway authorities for local roads in Berkshire: Bracknell Forest Council, Reading Council, Slough Council, West Berkshire Council, Windsor and Maidenhead Council and Wokingham Council.
Choose your town in Berkshire
Guide prices in Berkshire
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £2,095–£5,245 + VAT | Rated for a 7.5 t vehicle at 30 mph (48 km/h), tested foundation |
| Upgraded | £4,345–£7,445 + VAT | Rated for 7.5 t at 40 mph (64 km/h), tested foundation |
| Premium | £6,545–£9,545 + VAT | Rated for 7.5 t at 50 mph (80 km/h), or a specialist foundation |
Per bollard position, supplied and installed; +6% for South East. Guide only — the fixed price follows a survey.
Highway and planning authorities in Berkshire
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Reading | Reading Council | Reading Council |
| Slough | Slough Council | Slough Council |
| Bracknell | Bracknell Forest Council | Bracknell Forest Council |
| Maidenhead | Windsor and Maidenhead Council | Windsor and Maidenhead Council |
| Wokingham | Wokingham Council | Wokingham Council |
| Newbury | West Berkshire Council | West Berkshire Council |
| Windsor | Windsor and Maidenhead Council | Windsor and Maidenhead Council |
| Crowthorne | Bracknell Forest Council | Bracknell Forest Council |
| Thatcham | West Berkshire Council | West Berkshire Council |
| Sandhurst | Bracknell Forest Council | Bracknell Forest Council |
Rules for shallow-mount bollards in England
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first. Crash ratings (ISO 22343-1, or the superseded but still accepted PAS 68 and IWA 14-1) only hold when the product is installed to its tested foundation.
Details and sources: bollard rules in England.
How installation works
Map what is underground
Utility records, radar scanning and trial holes establish exactly how much depth is available along the line. This is the survey that decides whether a shallow system will fit at all.
Cut and excavate the trench
Paving is lifted and kept for reuse where possible, and a shallow trench is excavated by hand near known services. Where a service sits higher than expected, work stops and the detail is referred back.
Assemble and level the frame
Frame sections are placed, joined and set to line and level, with posts fixed as the drawing shows. Joints and fixings are photographed before any concrete goes in.
Pour, cure and reinstate
Concrete is placed to the specified grade and finish depth, then the surface is rebuilt to match. The line is protected until the specified curing period has passed.
Shallow-mount bollards in Berkshire: FAQs
Do you cover all of Berkshire for shallow-mount bollards?
Yes — including Reading, Slough, Bracknell, Maidenhead, Wokingham, Newbury, Windsor and Crowthorne. Enter your postcode in the price calculator to confirm.
How much do shallow-mount bollards cost in Berkshire?
In Berkshire, typically £2,095–£9,545 per bollard position, supplied and installed, plus VAT, with a minimum job of £5,295 plus VAT, using our South East guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in Berkshire?
For local roads, Bracknell Forest Council, Reading Council, Slough Council, West Berkshire Council, Windsor and Maidenhead Council and Wokingham Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.
Will future roadworks damage the system?
They can if contractors dig beside it without knowing it is there. That is why we provide as-built drawings showing the frame position. Ask anyone excavating nearby to check those drawings first.
What if a service turns out to be higher than the records show?
Work stops at that position and the finding goes back to the manufacturer and your adviser. Sometimes the frame can be adjusted within tested limits; sometimes the utility has to be lowered or the line moved. We do not improvise a change to a rated foundation on site.