Essex · England
Bollard removal in Brentwood
Bollard removal jobs for sites across Brentwood and the rest of Essex, from the first measurement to the last relaid paving block.
Computer-generated imageBrentwood bollard removal jobs
In the town of Brentwood, bollard removal jobs tend to go in at local parades, residential driveways and filling-station forecourts. Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match.
We work across CM14, CM13, CM15 and CM4 — Brentwood itself and places including Navestock Side, St Vincent's Hamlet, Coxtie Green and Kelvedon Hatch. Jobs in Brentwood can be combined with work in Billericay (4.9 miles), Havering (4.9 miles), Basildon (7.5 miles) and South Ockendon (7.9 miles) (straight-line distances). Southend-on-Sea is around 18 miles away.
Key facts for this area
- Area
- Essex, England
- Highway authority
- Essex County Council (local roads)
- Planning authority
- the council for Brentwood
- Postcodes
- CM14, CM13, CM15 and CM4
- Guide price
- Typically £80–£355 per post + VAT (£95–£425 inc VAT for homes); minimum job £295
- Survey
- Free, with a fixed written quote
- Nearby
- Billericay (4.9 mi), Havering (4.9 mi), Basildon (7.5 mi), South Ockendon (7.9 mi)
Guide prices for Brentwood
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £80–£195 + VAT · £95–£225 inc VAT | Post out, hole backfilled, simple surface |
| Upgraded | £165–£275 + VAT · £195–£325 inc VAT | Footing removed, tarmac or block paving reinstated |
| Premium | £245–£355 + VAT · £285–£425 inc VAT | Large footing, concrete or natural stone reinstated |
Per post removed with footing, surface made good; +3% for East of England. Guide only — the fixed price follows a survey.
Typical bollard removal jobs requests in Brentwood
Why sites in Brentwood book bollard removal jobs:
- Car park and forecourt redesigns
- Removing redundant lighting bollards
- Moving bollards to new positions on the same site
What we check first in Brentwood
The highway authority for local roads in Brentwood is Essex County Council; motorways and trunk roads sit with National Highways. Bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.
If your site in Brentwood is listed or inside a conservation area, check with the local planning authority (the council for Brentwood) before choosing a finish — heritage settings often favour cast iron or painted steel over stainless.
Where the area is being resurfaced anyway, removal is timed to happen first so the patching disappears under the new surface. Backfilling in compacted layers stops later settlement, which otherwise shows as a dip in the new surface.
- Check whether the bollards were required by a planning condition, lease, security plan or the highway authority before removing them.
- Collect and dispose of hydraulic fluid and waste properly rather than leaving it in the ground.
From survey to handover
Survey what is in the ground
The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.
Check consents and reasons
Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.
Remove posts and foundations
Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.
Specification choices
| Option | Detail |
|---|---|
| Socket and cassette removal | Removable sockets and telescopic or semi-automatic cassettes extracted whole and the hole filled. |
| Full extraction | Post and foundation broken out, leaving clear ground for resurfacing or new works. |
| Relocation | Careful removal of reusable posts and reinstallation in new positions on the same site. |
What moves the price in Brentwood
When we price bollard removal jobs in Brentwood, these make the biggest difference:
- Access, working hours and waste disposal
- Electrical isolation and hydraulic drain-down
- Surface type and reinstatement
After installation
Where cables were terminated rather than removed, record where they are and confirm with the electrician that they are dead and labelled. Keep any keys, manuals and records from removed automatic bollards until the controller and cabling have also been dealt with, as they help an electrician confirm what was connected.
We can also service, repair or replace existing posts anywhere in Brentwood.
Common questions
Which parts of Brentwood do you cover for bollard removal jobs?
We cover all of Brentwood (CM14, CM13, CM15 and CM4) and the rest of Essex. We also work in Billericay, Havering and Basildon.
Who gives permission for bollards on the pavement in Brentwood?
In Brentwood, work on adopted pavements and verges needs consent from Essex County Council, the local highway authority. Car parks, forecourts and other private land only need the owner's permission.
How much do bollard removal jobs cost in Brentwood?
In Brentwood, typically £80–£355 per post removed with footing, surface made good, plus VAT (£95–£425 including VAT for homeowners), with a minimum job of £295 plus VAT, using our East of England guide prices. The fixed figure comes in writing after we've seen the site.
What happens to the waste?
Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.
Can automatic bollards be removed safely?
Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.
Bollard removal near Brentwood
- Billericay (4.9 mi)
- Havering (4.9 mi)
- Basildon (7.5 mi)
- South Ockendon (7.9 mi)
- Barking and Dagenham (8 mi)
- Stanford-le-Hope (8.8 mi)