Wales · 1 towns
Bollard removal in Isle of Anglesey
Bollard removal for sites across Isle of Anglesey: surveyed, quoted in writing and installed by our crews.
Computer-generated imageBollard removal in Isle of Anglesey
Across Isle of Anglesey, typical sites for bollard removal jobs include schools, local parades and community buildings. Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match.
Highway authorities for local roads in Isle of Anglesey: Isle of Anglesey County Council.
Choose your town in Isle of Anglesey
Guide prices in Isle of Anglesey
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £80–£185 + VAT · £95–£215 inc VAT | Post out, hole backfilled, simple surface |
| Upgraded | £155–£265 + VAT · £185–£315 inc VAT | Footing removed, tarmac or block paving reinstated |
| Premium | £225–£335 + VAT · £265–£395 inc VAT | Large footing, concrete or natural stone reinstated |
Per post removed with footing, surface made good; -3% for Wales. Guide only — the fixed price follows a survey.
Who looks after the roads in Isle of Anglesey
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Holyhead | Isle of Anglesey County Council | Isle of Anglesey County Council |
Rules for bollard removal jobs in Wales
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first.
Details and sources: bollard rules in Wales.
How installation works
Check consents and reasons
Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.
Make supplies safe
For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.
Remove posts and foundations
Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.
Backfill and reinstate
Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.
Bollard removal in Isle of Anglesey: FAQs
Do you cover all of Isle of Anglesey for bollard removal jobs?
Yes — including Holyhead. Enter your postcode in the price calculator to confirm.
How much do bollard removal jobs cost in Isle of Anglesey?
In Isle of Anglesey, typically £80–£335 per post removed with footing, surface made good, plus VAT (£95–£395 including VAT for homeowners), with a minimum job of £285 plus VAT, using our Wales guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in Isle of Anglesey?
For local roads, Isle of Anglesey County Council; the Welsh Government covers trunk roads. Bollards on adopted highway need the authority's written agreement.
Should bollards be cut off or fully removed?
Cut off if the area is staying as it is and nothing will be built or dug there later. Fully remove if you are resurfacing, planting or installing something new, because buried concrete gets in the way. The quote can price both.
Will the surface look patched after removal?
On block paving it can be nearly invisible, as the blocks are relaid. Tarmac, resin and concrete usually show a patch, especially on older weathered surfaces. Timing removal before resurfacing avoids that.