Kent · England
Bollard removal in Herne Bay
Local installation of bollard removal jobs in Herne Bay — free survey, fixed written price, and posts set to the right spacing for people and vehicles.
Computer-generated imageAbout bollard removal jobs in Herne Bay
Whether it's filling-station forecourts, residential driveways and community buildings, bollard removal jobs in Herne Bay are planned around who needs to get through and who doesn't. Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match.
Coverage in Herne Bay takes in the CT6 postcode district and nearby places like Greenhill, Hunters Forstal, Herne Common and Reculver. Nearby, we also work in Whitstable (4.5 miles), Canterbury (6.8 miles), Faversham (11.1 miles) and Margate (11.1 miles), measured as the crow flies.
Local details
- Area
- Kent, England
- Highway authority
- Kent County Council (local roads)
- Planning authority
- the council for Canterbury
- Postcodes
- CT6
- Guide price
- Typically £85–£365 per post + VAT (£95–£435 inc VAT for homes); minimum job £305
- Survey
- Free, with a fixed written quote
- Nearby
- Whitstable (4.5 mi), Canterbury (6.8 mi), Faversham (11.1 mi), Margate (11.1 mi)
Bollard removal prices in Herne Bay
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £85–£205 + VAT · £95–£245 inc VAT | Post out, hole backfilled, simple surface |
| Upgraded | £165–£285 + VAT · £195–£335 inc VAT | Footing removed, tarmac or block paving reinstated |
| Premium | £255–£365 + VAT · £305–£435 inc VAT | Large footing, concrete or natural stone reinstated |
Per post removed with footing, surface made good; +6% for South East. Guide only — the fixed price follows a survey.
Typical bollard removal jobs requests in Herne Bay
Typical reasons for bollard removal jobs in Herne Bay:
- Clearing old bollards before resurfacing
- Removing redundant lighting bollards
- Car park and forecourt redesigns
Permissions and groundwork in Herne Bay
Kent County Council is the highway authority covering Herne Bay's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.
Bollards on private land often don't need planning permission, but it depends on the council's view, the height and the location; in a conservation area, next to a listed building or under an Article 4 direction, ask the local planning authority (the council for Canterbury) first — we flag this at survey.
Where the area is being resurfaced anyway, removal is timed to happen first so the patching disappears under the new surface. Backfilling in compacted layers stops later settlement, which otherwise shows as a dip in the new surface.
- Check whether the bollards were required by a planning condition, lease, security plan or the highway authority before removing them.
- Collect and dispose of hydraulic fluid and waste properly rather than leaving it in the ground.
From survey to handover
Survey what is in the ground
The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.
Check consents and reasons
Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.
Make supplies safe
For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.
Specification choices
| Option | Detail |
|---|---|
| Lighting bollard removal | Supply made dead and cables terminated or removed by a qualified electrician before posts are lifted. |
| Relocation | Careful removal of reusable posts and reinstallation in new positions on the same site. |
| Full extraction | Post and foundation broken out, leaving clear ground for resurfacing or new works. |
What moves the price in Herne Bay
When we price bollard removal jobs in Herne Bay, these make the biggest difference:
- Size of foundations and amount of spoil
- Cutting off or full foundation extraction
- Electrical isolation and hydraulic drain-down
Looking after them
If foundations were left in place, record their positions on site drawings so future contractors are not surprised by buried concrete. Where cables were terminated rather than removed, record where they are and confirm with the electrician that they are dead and labelled.
If posts in Herne Bay are later hit or damaged, we can repair or replace them — see bollard repairs.
Bollard removal in Herne Bay: FAQs
Can you carry out bollard removal jobs anywhere in Herne Bay?
We cover all of Herne Bay (CT6) and the rest of Kent. We also work in Whitstable, Canterbury and Faversham.
Who gives permission for bollards on the pavement in Herne Bay?
The highway authority for local roads in Herne Bay is Kent County Council; motorways and trunk roads sit with National Highways. Bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.
How much do bollard removal jobs cost in Herne Bay?
In Herne Bay, typically £85–£365 per post removed with footing, surface made good, plus VAT (£95–£435 including VAT for homeowners), with a minimum job of £305 plus VAT, using our South East guide prices. The fixed figure comes in writing after we've seen the site.
Should bollards be cut off or fully removed?
Cut off if the area is staying as it is and nothing will be built or dug there later. Fully remove if you are resurfacing, planting or installing something new, because buried concrete gets in the way. The quote can price both.
What happens to the waste?
Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.