Bollard Installers

North Yorkshire · England

Bollard removal in Redcar

Bollard removal jobs for sites across Redcar and the rest of North Yorkshire, from the first measurement to the last relaid paving block.

Neat excavation in block paving where a bollard was removed, the old post and concrete root lying beside it, cones and barrier aroundComputer-generated image

Bollard removal in Redcar

Bollard removal jobs suit plenty of Redcar sites, high street shopfronts, community buildings and small industrial units among them. Posts can be cut off at or below ground level or fully extracted with their concrete.

We cover Redcar's TS10, TS11, TS6, TS12 and TS14 postcode districts, including places such as Kirkleatham, Marske-by-the-Sea, New Marske and Yearby. We also cover neighbouring Middlesbrough (7.5 miles), Hartlepool (7.7 miles), Billingham (9.4 miles) and Stockton-on-Tees (10.9 miles) — distances are straight-line. Redcar is about 33 miles from Newcastle upon Tyne.

Local details

Area
North Yorkshire, England
Highway authority
Redcar and Cleveland Council (local roads)
Planning authority
Redcar and Cleveland Council
Postcodes
TS10, TS11, TS6, TS12 and TS14
Guide price
Typically £75–£335 per post + VAT (£90–£395 inc VAT for homes); minimum job £275
Survey
Free, with a fixed written quote
Nearby
Middlesbrough (7.5 mi), Hartlepool (7.7 mi), Billingham (9.4 mi), Stockton-on-Tees (10.9 mi)

Redcar: typical bollard removal prices

SpecificationGuide priceIncludes
Standard£75–£185 + VAT · £90–£215 inc VATPost out, hole backfilled, simple surface
Upgraded£145–£255 + VAT · £165–£305 inc VATFooting removed, tarmac or block paving reinstated
Premium£225–£335 + VAT · £265–£395 inc VATLarge footing, concrete or natural stone reinstated

Per post removed with footing, surface made good; -4% for North East. Guide only — the fixed price follows a survey.

Typical bollard removal jobs requests in Redcar

Why sites in Redcar book bollard removal jobs:

  • Access routes no longer needing control
  • Car park and forecourt redesigns
  • Taking out broken stubs and empty sockets

Permissions and groundwork in Redcar

Redcar and Cleveland Council is the highway authority covering Redcar's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

If your site in Redcar is listed or inside a conservation area, check with the local planning authority (Redcar and Cleveland Council) before choosing a finish — heritage settings often favour cast iron or painted steel over stainless.

Backfilling in compacted layers stops later settlement, which otherwise shows as a dip in the new surface. Where the area is being resurfaced anyway, removal is timed to happen first so the patching disappears under the new surface.

  • Collect and dispose of hydraulic fluid and waste properly rather than leaving it in the ground.
  • Check whether the bollards were required by a planning condition, lease, security plan or the highway authority before removing them.

From survey to handover

Survey what is in the ground

The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.

Make supplies safe

For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.

Backfill and reinstate

Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.

Specification choices

OptionDetail
RelocationCareful removal of reusable posts and reinstallation in new positions on the same site.
Socket and cassette removalRemovable sockets and telescopic or semi-automatic cassettes extracted whole and the hole filled.
Lighting bollard removalSupply made dead and cables terminated or removed by a qualified electrician before posts are lifted.

What affects the quote

When we price bollard removal jobs in Redcar, these make the biggest difference:

  • Surface type and reinstatement
  • Cutting off or full foundation extraction
  • Size of foundations and amount of spoil

Looking after them

Where cables were terminated rather than removed, record where they are and confirm with the electrician that they are dead and labelled. Keep any keys, manuals and records from removed automatic bollards until the controller and cabling have also been dealt with, as they help an electrician confirm what was connected.

If posts in Redcar are later hit or damaged, we can repair or replace them — see bollard repairs.

Common questions

Which parts of Redcar do you cover for bollard removal jobs?

We cover all of Redcar (TS10, TS11, TS6, TS12 and TS14) and the rest of North Yorkshire. We also work in Middlesbrough, Hartlepool and Billingham.

Who gives permission for bollards on the pavement in Redcar?

In Redcar, work on adopted pavements and verges needs consent from Redcar and Cleveland Council, the local highway authority. Car parks, forecourts and other private land only need the owner's permission.

What's a typical price for bollard removal jobs in Redcar?

In Redcar, typically £75–£335 per post removed with footing, surface made good, plus VAT (£90–£395 including VAT for homeowners), with a minimum job of £275 plus VAT, using our North East guide prices. The fixed figure comes in writing after we've seen the site.

Can automatic bollards be removed safely?

Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.

What happens to the waste?

Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.

Bollard removal in nearby towns

More from us in Redcar

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote