Bollard Installers

Nottinghamshire · England

Bollard removal in Kirkby-in-Ashfield

Planning bollard removal jobs in Kirkby-in-Ashfield? We check ownership, consents and buried services first, then quote a fixed price.

Neat excavation in block paving where a bollard was removed, the old post and concrete root lying beside it, cones and barrier aroundComputer-generated image

Bollard removal in Kirkby-in-Ashfield

Whether it's filling-station forecourts, community buildings and small industrial units, bollard removal jobs in Kirkby-in-Ashfield are planned around who needs to get through and who doesn't. Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match.

Coverage in Kirkby-in-Ashfield takes in the NG17 postcode district and nearby places like Annesley Woodhouse. Jobs in Kirkby-in-Ashfield can be combined with work in Sutton-in-Ashfield (1.9 miles), Mansfield (2.9 miles), Hucknall (4.9 miles) and Alfreton (5.8 miles) (straight-line distances). It sits roughly 11 miles from Nottingham as the crow flies.

Kirkby-in-Ashfield at a glance

Area
Nottinghamshire, England
Highway authority
Nottinghamshire County Council (local roads)
Planning authority
the council for Ashfield
Postcodes
NG17
Guide price
Typically £80–£335 per post + VAT (£95–£395 inc VAT for homes); minimum job £285
Survey
Free, with a fixed written quote
Nearby
Sutton-in-Ashfield (1.9 mi), Mansfield (2.9 mi), Hucknall (4.9 mi), Alfreton (5.8 mi)

Kirkby-in-Ashfield: typical bollard removal prices

SpecificationGuide priceIncludes
Standard£80–£185 + VAT · £95–£215 inc VATPost out, hole backfilled, simple surface
Upgraded£155–£265 + VAT · £185–£315 inc VATFooting removed, tarmac or block paving reinstated
Premium£235–£335 + VAT · £275–£395 inc VATLarge footing, concrete or natural stone reinstated

Per post removed with footing, surface made good; -2% for East Midlands. Guide only — the fixed price follows a survey.

Common reasons for bollard removal jobs in Kirkby-in-Ashfield

Why sites in Kirkby-in-Ashfield book bollard removal jobs:

  • Car park and forecourt redesigns
  • Taking out broken stubs and empty sockets
  • Clearing old bollards before resurfacing

Permissions and groundwork in Kirkby-in-Ashfield

Nottinghamshire County Council is the highway authority covering Kirkby-in-Ashfield's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

Bollards on private land often don't need planning permission, but it depends on the council's view, the height and the location; in a conservation area, next to a listed building or under an Article 4 direction, ask the local planning authority (the council for Ashfield) first — we flag this at survey.

Foundations are rarely the size anyone expects. Cables and pipes are often laid close to existing posts after they were installed, so breaking out is done carefully and services are traced first.

  • In conservation areas, check before removing historic bollards, as consent may be needed or retention expected.
  • Have automatic and lighting bollard supplies isolated and made safe by a qualified electrician.

What happens on site

Check consents and reasons

Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.

Remove posts and foundations

Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.

Backfill and reinstate

Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.

Finishes and options

OptionDetail
Lighting bollard removalSupply made dead and cables terminated or removed by a qualified electrician before posts are lifted.
Automatic bollard decommissioningElectrical isolation, hydraulic drain-down, cassette removal and capping of ducts.
Socket and cassette removalRemovable sockets and telescopic or semi-automatic cassettes extracted whole and the hole filled.

Pricing bollard removal jobs in Kirkby-in-Ashfield

Two Kirkby-in-Ashfield jobs with the same number of posts can price quite differently. The usual reasons:

  • Cutting off or full foundation extraction
  • Access, working hours and waste disposal
  • Number and type of bollards

After installation

If foundations were left in place, record their positions on site drawings so future contractors are not surprised by buried concrete. Keep any keys, manuals and records from removed automatic bollards until the controller and cabling have also been dealt with, as they help an electrician confirm what was connected.

We can also service, repair or replace existing posts anywhere in Kirkby-in-Ashfield.

Questions about bollard removal jobs in Kirkby-in-Ashfield

Can you carry out bollard removal jobs anywhere in Kirkby-in-Ashfield?

We cover all of Kirkby-in-Ashfield (NG17) and the rest of Nottinghamshire. We also work in Sutton-in-Ashfield, Mansfield and Hucknall.

Who gives permission for bollards on the pavement in Kirkby-in-Ashfield?

Nottinghamshire County Council is the highway authority covering Kirkby-in-Ashfield's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

What's a typical price for bollard removal jobs in Kirkby-in-Ashfield?

In Kirkby-in-Ashfield, typically £80–£335 per post removed with footing, surface made good, plus VAT (£95–£395 including VAT for homeowners), with a minimum job of £285 plus VAT, using our East Midlands guide prices. The fixed figure comes in writing after we've seen the site.

What happens to the waste?

Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.

Can automatic bollards be removed safely?

Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.

Bollard removal in nearby towns

Other bollard services in Kirkby-in-Ashfield

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote