Bollard Installers

West Midlands · England

Bollard removal in Shirley

Bollard removal jobs for sites across Shirley and the rest of West Midlands, from the first measurement to the last relaid paving block.

Neat excavation in block paving where a bollard was removed, the old post and concrete root lying beside it, cones and barrier aroundComputer-generated image

Bollard removal in Shirley

Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match. In Shirley, that tends to mean sites such as high street shopfronts, small industrial units and community car parks.

We work across B90 — Shirley itself and places including Dickens Heath, Cheswick Green, Tidbury Green and Major's Green. Nearby, we also work in Solihull (1.6 miles), Birmingham (5.9 miles), Smethwick (8.4 miles) and Redditch (9 miles), measured as the crow flies. Birmingham is around 6 miles away.

Shirley at a glance

Area
West Midlands, England
Highway authority
Solihull Council (local roads)
Planning authority
Solihull Council
Postcodes
B90
Guide price
Typically £80–£345 per post + VAT (£95–£405 inc VAT for homes); minimum job £295
Survey
Free, with a fixed written quote
Nearby
Solihull (1.6 mi), Birmingham (5.9 mi), Smethwick (8.4 mi), Redditch (9 mi)

What bollard removal jobs cost in Shirley

SpecificationGuide priceIncludes
Standard£80–£185 + VAT · £95–£215 inc VATPost out, hole backfilled, simple surface
Upgraded£155–£265 + VAT · £185–£315 inc VATFooting removed, tarmac or block paving reinstated
Premium£235–£345 + VAT · £275–£405 inc VATLarge footing, concrete or natural stone reinstated

Per post removed with footing, surface made good; no regional adjustment. Guide only — the fixed price follows a survey.

Why Shirley sites book bollard removal jobs

Why sites in Shirley book bollard removal jobs:

  • Clearing old bollards before resurfacing
  • Removing redundant lighting bollards
  • Taking out broken stubs and empty sockets

Permissions and groundwork in Shirley

Solihull Council is the highway authority covering Shirley's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

Bollards on private land often don't need planning permission, but it depends on the council's view, the height and the location; in a conservation area, next to a listed building or under an Article 4 direction, ask the local planning authority (Solihull Council) first — we flag this at survey.

Cables and pipes are often laid close to existing posts after they were installed, so breaking out is done carefully and services are traced first. Backfilling in compacted layers stops later settlement, which otherwise shows as a dip in the new surface.

  • Check whether the bollards were required by a planning condition, lease, security plan or the highway authority before removing them.
  • Have automatic and lighting bollard supplies isolated and made safe by a qualified electrician.

From survey to handover

Survey what is in the ground

The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.

Check consents and reasons

Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.

Backfill and reinstate

Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.

Choosing the right spec

OptionDetail
Socket and cassette removalRemovable sockets and telescopic or semi-automatic cassettes extracted whole and the hole filled.
RelocationCareful removal of reusable posts and reinstallation in new positions on the same site.
Full extractionPost and foundation broken out, leaving clear ground for resurfacing or new works.

Pricing bollard removal jobs in Shirley

Our West Midlands guide prices are a starting point; the survey in Shirley firms them up. What tends to move them:

  • Electrical isolation and hydraulic drain-down
  • Access, working hours and waste disposal
  • Number and type of bollards

After installation

If foundations were left in place, record their positions on site drawings so future contractors are not surprised by buried concrete. Keep any keys, manuals and records from removed automatic bollards until the controller and cabling have also been dealt with, as they help an electrician confirm what was connected.

If posts in Shirley are later hit or damaged, we can repair or replace them — see bollard repairs.

Common questions

Can you carry out bollard removal jobs anywhere in Shirley?

We cover all of Shirley (B90) and the rest of West Midlands. We also work in Solihull, Birmingham and Smethwick.

Do I need consent for bollards on a public footway in Shirley?

Solihull Council is the highway authority covering Shirley's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

How much do bollard removal jobs cost in Shirley?

In Shirley, typically £80–£345 per post removed with footing, surface made good, plus VAT (£95–£405 including VAT for homeowners), with a minimum job of £295 plus VAT, using our West Midlands guide prices. The fixed figure comes in writing after we've seen the site.

What happens to the waste?

Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.

Can automatic bollards be removed safely?

Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.

Bollard removal near Shirley

Other bollard services in Shirley

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote