Bollard removal in Redditch

Bollard removal jobs for sites across Redditch and the rest of Worcestershire, from the first measurement to the last relaid paving block.

Neat excavation in block paving where a bollard was removed, the old post and concrete root lying beside it, cones and barrier aroundComputer-generated image

Bollard removal in Redditch

Across Redditch, typical sites for bollard removal jobs include college campuses, business parks and retail parks. Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match.

Coverage in Redditch takes in the B97, B98 and B96 postcode districts and nearby places like Ham Green, Elcock's Brook, Beoley and Astwood Bank. Nearby, we also work in Bromsgrove (5.2 miles), Shirley (9 miles), Droitwich (9.1 miles) and Solihull (10.2 miles), measured as the crow flies. Redditch is about 12 miles from Birmingham.

Key facts for this area

Area
Worcestershire, England
Highway authority
Worcestershire County Council (local roads)
Planning authority
the council for Redditch
Postcodes
B97, B98 and B96
Guide price
Typically £80–£345 per post + VAT (£95–£405 inc VAT for homes); minimum job £295
Survey
Free, with a fixed written quote
Nearby
Bromsgrove (5.2 mi), Shirley (9 mi), Droitwich (9.1 mi), Solihull (10.2 mi)

Redditch: typical bollard removal prices

SpecificationGuide priceIncludes
Standard£80–£185 + VAT · £95–£215 inc VATPost out, hole backfilled, simple surface
Upgraded£155–£265 + VAT · £185–£315 inc VATFooting removed, tarmac or block paving reinstated
Premium£235–£345 + VAT · £275–£405 inc VATLarge footing, concrete or natural stone reinstated

Per post removed with footing, surface made good; no regional adjustment. Guide only — the fixed price follows a survey.

Common reasons for bollard removal jobs in Redditch

Why sites in Redditch book bollard removal jobs:

  • Taking out broken stubs and empty sockets
  • Access routes no longer needing control
  • Moving bollards to new positions on the same site

What we check first in Redditch

In Redditch, work on adopted pavements and verges needs consent from Worcestershire County Council, the local highway authority. Car parks, forecourts and other private land only need the owner's permission.

If your site in Redditch is listed or inside a conservation area, check with the local planning authority (the council for Redditch) before choosing a finish — heritage settings often favour cast iron or painted steel over stainless.

Cables and pipes are often laid close to existing posts after they were installed, so breaking out is done carefully and services are traced first. Foundations are rarely the size anyone expects.

  • Check whether the bollards were required by a planning condition, lease, security plan or the highway authority before removing them.
  • Consider whether removal leaves an asset or route unprotected and record the decision in your risk assessment.

How the job runs

Survey what is in the ground

The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.

Remove posts and foundations

Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.

Backfill and reinstate

Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.

Choosing the right spec

OptionDetail
Automatic bollard decommissioningElectrical isolation, hydraulic drain-down, cassette removal and capping of ducts.
RelocationCareful removal of reusable posts and reinstallation in new positions on the same site.
Full extractionPost and foundation broken out, leaving clear ground for resurfacing or new works.

What moves the price in Redditch

Our West Midlands guide prices are a starting point; the survey in Redditch firms them up. What tends to move them:

  • Size of foundations and amount of spoil
  • Access, working hours and waste disposal
  • Number and type of bollards

After installation

If foundations were left in place, record their positions on site drawings so future contractors are not surprised by buried concrete. After removal, keep an eye on reinstated areas for settlement over the following months, particularly where large foundations were broken out.

If posts in Redditch are later hit or damaged, we can repair or replace them — see bollard repairs.

Common questions

Can you carry out bollard removal jobs anywhere in Redditch?

We cover all of Redditch (B97, B98 and B96) and the rest of Worcestershire. We also work in Bromsgrove, Shirley and Droitwich.

Who gives permission for bollards on the pavement in Redditch?

The highway authority for local roads in Redditch is Worcestershire County Council; motorways and trunk roads sit with National Highways. Bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.

What's a typical price for bollard removal jobs in Redditch?

In Redditch, typically £80–£345 per post removed with footing, surface made good, plus VAT (£95–£405 including VAT for homeowners), with a minimum job of £295 plus VAT, using our West Midlands guide prices. The fixed figure comes in writing after we've seen the site.

What happens to the waste?

Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.

Can automatic bollards be removed safely?

Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.