England · 7 towns
Bollard repairs in Cambridgeshire
Bollard repairs across Cambridgeshire: visit price confirmed in writing, then a clear report and a fixed price for anything further.
Computer-generated imageBollard repairs in Cambridgeshire
We supply and install bollard repairs across Cambridgeshire, with local pages for 7 towns below. Paid repair visits for loose, leaning and damaged bollards: re-bedding, re-fixing, new sockets, locks, caps and reflective bands.
Highway authorities for local roads in Cambridgeshire: Cambridgeshire County Council and Peterborough City Council.
Choose your town in Cambridgeshire
Guide prices in Cambridgeshire
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £115–£265 + VAT · £135–£315 inc VAT | Straighten or re-bed one post |
| Upgraded | £225–£365 + VAT · £265–£435 inc VAT | Several posts, or new socket, lock or band |
| Premium | £325–£455 + VAT · £385–£545 inc VAT | Larger repair with new foundation |
Per visit, typically one to three posts; +3% for East of England. Guide only — the visit price is confirmed in writing first.
Who looks after the roads in Cambridgeshire
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Peterborough | Peterborough City Council | Peterborough City Council |
| Cambridge | Cambridgeshire County Council | Cambridgeshire County Council |
| Wisbech | Cambridgeshire County Council | the council for Fenland |
| St Neots | Cambridgeshire County Council | the council for Huntingdonshire |
| Huntingdon | Cambridgeshire County Council | the council for Huntingdonshire |
| March | Cambridgeshire County Council | the council for Fenland |
| Ely | Cambridgeshire County Council | the council for East Cambridgeshire |
Rules for bollard repairs in England
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first.
Details and sources: bollard rules in England.
How installation works
Send photos and details
Tell us what has happened and send photographs of each affected post, close up and from a distance, with the location. That lets us identify the bollard type and the likely repair.
Receive a written price
We confirm the cost of the visit and the expected work in writing before anyone attends. Nothing is done until you have agreed it.
Make safe if needed
Where a post is a hazard now, the first step can be to make it safe by removing or capping it, priced separately in writing so you can approve it on its own.
Carry out the repair
The crew carries out the agreed work. If they find something different, such as a cracked slab under a base plate, they stop and we price the extra work in writing before continuing.
Bollard repairs in Cambridgeshire: FAQs
Do you cover all of Cambridgeshire for bollard repairs?
Yes — including Peterborough, Cambridge, Wisbech, St Neots, Huntingdon, March and Ely. Enter your postcode in the price calculator to confirm.
How much do bollard repairs cost in Cambridgeshire?
In Cambridgeshire, typically £115–£455 per visit, typically one to three posts, plus VAT (£135–£545 including VAT for homeowners), using our East of England guide prices. We confirm the visit price in writing before attending.
Who do I ask about bollards on public land in Cambridgeshire?
For local roads, Cambridgeshire County Council and Peterborough City Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.
Why does our base-plated bollard keep working loose?
Usually because the anchors are in weak, cracked or thin concrete, or too close to an edge or joint. Re-tightening does not last. New anchors in fresh positions, a larger plate or a slab repair is the lasting fix.
What happens if the crew finds more damage than expected?
They stop and tell you, and we price the extra work in writing. You decide whether to go ahead. Nothing beyond the agreed price is carried out without your approval.