England · 10 towns
Bollard replacement in Berkshire
Bollard replacement for sites across Berkshire: surveyed, quoted in writing and installed by our crews.
Computer-generated imageBollard replacement in Berkshire
We supply and install replacement bollards across Berkshire, with local pages for 10 towns below. Like-for-like or upgraded replacement of bollards damaged by vehicles, corrosion or wear, matched to the existing line.
Highway authorities for local roads in Berkshire: Bracknell Forest Council, Reading Council, Slough Council, West Berkshire Council, Windsor and Maidenhead Council and Wokingham Council.
Choose your town in Berkshire
Guide prices in Berkshire
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £225–£665 + VAT · £265–£795 inc VAT | Standard post, foundation, reinstatement |
| Upgraded | £535–£975 + VAT · £635–£1,145 inc VAT | Upgraded finish or fittings, reflective band, matched keys |
| Premium | £855–£1,245 + VAT · £1,045–£1,495 inc VAT | Heavy-duty or architectural spec, premium finish |
Per post replaced, old post and footing removed; +6% for South East. Guide only — the fixed price follows a survey.
Highway and planning authorities in Berkshire
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| Reading | Reading Council | Reading Council |
| Slough | Slough Council | Slough Council |
| Bracknell | Bracknell Forest Council | Bracknell Forest Council |
| Maidenhead | Windsor and Maidenhead Council | Windsor and Maidenhead Council |
| Wokingham | Wokingham Council | Wokingham Council |
| Newbury | West Berkshire Council | West Berkshire Council |
| Windsor | Windsor and Maidenhead Council | Windsor and Maidenhead Council |
| Crowthorne | Bracknell Forest Council | Bracknell Forest Council |
| Thatcham | West Berkshire Council | West Berkshire Council |
| Sandhurst | Bracknell Forest Council | Bracknell Forest Council |
Rules for replacement bollards in England
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first.
Details and sources: bollard rules in England.
How installation works
Make safe
If a broken post or stub is a hazard, it can be removed or capped first. That is priced separately in writing so you can approve it on its own.
Survey and match
At the free site survey we measure the existing bollards, photograph the line and check the foundations. A fixed written quote sets out like-for-like and any upgrade options.
Order the replacement
Matching posts, sockets or castings are ordered, and you see details of any close equivalent before it is confirmed.
Remove the old bollard
The damaged post is cut or extracted and the old foundation broken out, checking for services as the hole is opened.
Bollard replacement in Berkshire: FAQs
Do you cover all of Berkshire for replacement bollards?
Yes — including Reading, Slough, Bracknell, Maidenhead, Wokingham, Newbury, Windsor and Crowthorne. Enter your postcode in the price calculator to confirm.
How much do replacement bollards cost in Berkshire?
In Berkshire, typically £225–£1,245 per post replaced, old post and footing removed, plus VAT (£265–£1,495 including VAT for homeowners), with a minimum job of £465 plus VAT, using our South East guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in Berkshire?
For local roads, Bracknell Forest Council, Reading Council, Slough Council, West Berkshire Council, Windsor and Maidenhead Council and Wokingham Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.
Can you replace just one bollard in a line?
Yes. We measure and match the existing posts so the new one sits in line at the same height and finish. If the original product is no longer made, we show you a close equivalent first.
Should we replace like-for-like or upgrade?
Like-for-like if the post was hit once in an unusual incident. Consider an upgrade if the same position is struck repeatedly or the post no longer suits how the site is used. The survey will show which makes sense.