Concrete bollard installation in North Yorkshire
Concrete bollards for sites across North Yorkshire: surveyed, quoted in writing and installed by our crews.
Computer-generated imageConcrete bollards in North Yorkshire
We supply and install concrete bollards across North Yorkshire, with local pages for 7 towns below. Precast concrete and reconstituted stone bollards for public realm, parks, boundaries and estates, dowelled or bedded in place.
Highway authorities for local roads in North Yorkshire: City of York Council, Middlesbrough Council, North Yorkshire Council, Redcar and Cleveland Council and Stockton-on-Tees Council.
Choose your town in North Yorkshire
Guide prices in North Yorkshire
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £165–£345 + VAT | Standard post, foundation, reinstatement |
| Upgraded | £295–£465 + VAT | Upgraded finish or fittings, reflective band, matched keys |
| Premium | £415–£575 + VAT | Heavy-duty or architectural spec, premium finish |
Per bollard, supplied and installed; -3% for Yorkshire and the Humber. Guide only — the fixed price follows a survey.
Highway and planning authorities in North Yorkshire
| Town | Highway / roads authority | Planning authority |
|---|---|---|
| York | City of York Council | City of York Council |
| Middlesbrough | Middlesbrough Council | Middlesbrough Council |
| Harrogate | North Yorkshire Council | North Yorkshire Council |
| Scarborough | North Yorkshire Council | North Yorkshire Council |
| Redcar | Redcar and Cleveland Council | Redcar and Cleveland Council |
| Selby | North Yorkshire Council | North Yorkshire Council |
| Thornaby-on-Tees | Stockton-on-Tees Council | Stockton-on-Tees Council |
Rules for concrete bollards in England
Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first. Accessibility guidance asks for posts at least 1,000 mm high with contrasting tops and no chains between them.
Details and sources: bollard rules in England.
How installation works
Plan lifting
Each bollard's weight is checked, and a lifting method is chosen, such as a vacuum lifter or crane arm, with an exclusion zone set during lifts.
Excavate and cast foundations
Small foundations are excavated, checked for services and cast with a dowel hole or sleeve at the right position and level.
Set the bollards
Each bollard is lowered onto a mortar bed with its dowel grouted in, checked plumb and aligned with its neighbours.
Protect while the grout cures
Bollards are left undisturbed until the grout and foundation have gained strength, with temporary barriers if vehicles use the area. Lines that need to open to traffic quickly can use faster-setting grouts where the product allows.
Concrete bollards in North Yorkshire: FAQs
Do you cover all of North Yorkshire for concrete bollards?
Yes — including York, Middlesbrough, Harrogate, Scarborough, Redcar, Selby and Thornaby-on-Tees. Enter your postcode in the price calculator to confirm.
How much do concrete bollards cost in North Yorkshire?
In North Yorkshire, typically £165–£575 per bollard, supplied and installed, plus VAT, with a minimum job of £575 plus VAT, using our Yorkshire and the Humber guide prices. The fixed figure comes in writing after we've seen the site.
Who do I ask about bollards on public land in North Yorkshire?
For local roads, City of York Council, Middlesbrough Council, North Yorkshire Council, Redcar and Cleveland Council and Stockton-on-Tees Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.
How are concrete bollards fixed down?
Usually with a steel dowel at the base grouted into a small concrete foundation, so they cannot be pushed or rocked. Some designs have a root buried in the ground instead. Free-standing placement is used only for temporary layouts.
Can concrete bollards be moved later?
Yes, though it takes lifting equipment. Dowel-fixed bollards can be lifted off once the grout is broken out, and the foundation removed or reused. Plan for it if you think the layout may change.