Bollard Installers

Armagh City, Banbridge and Craigavon · Northern Ireland

Ram-raid protection bollards in Portadown

Ram-raid bollards for sites across Portadown and the rest of Armagh City, Banbridge and Craigavon, from the first measurement to the last relaid paving block.

Stainless steel bollards protecting the glazed front of a convenience store on a terraced street at nightComputer-generated image

Ram-raid bollards in Portadown

We supply and fit ram-raid bollards throughout Portadown, typically for sites such as town-centre squares, high street shopfronts and filling-station forecourts. Bollards fitted in front of shopfronts, ATMs, jewellers and convenience stores to stop vehicles being used to break in.

We cover the BT62 and BT63 postcode districts in Portadown. Jobs in Portadown can be combined with work in Craigavon (2.8 miles), Banbridge (8.2 miles), Armagh (10.3 miles) and Dungannon (14.1 miles) (straight-line distances). It sits roughly 24 miles from Belfast as the crow flies.

Key facts for this area

Roads authority
the Department for Infrastructure (DfI Roads)
Planning authority
Armagh City, Banbridge and Craigavon Borough Council
Postcodes
BT62 and BT63
Guide price
Typically £385–£1,445 per bollard + VAT; minimum job £925
Survey
Free, with a fixed written quote
Nearby
Craigavon (2.8 mi), Banbridge (8.2 mi), Armagh (10.3 mi), Dungannon (14.1 mi)

Guide prices for Portadown

SpecificationGuide priceIncludes
Standard£385–£835 + VATStandard post, foundation, reinstatement
Upgraded£715–£1,145 + VATUpgraded finish or fittings, reflective band, matched keys
Premium£1,045–£1,445 + VATHeavy-duty or architectural spec, premium finish

Per bollard, supplied and installed; -2% for Northern Ireland. Guide only — the fixed price follows a survey.

Typical ram-raid bollards jobs in Portadown

Around Portadown, ram-raid bollards usually solve one of these:

  • Through-the-wall and freestanding ATMs
  • Warehouses and trade counters with roller-shutter entrances
  • Jewellers, pawnbrokers and phone shops holding high-value stock

What we check first in Portadown

Kerbside work in Portadown is a DfI Roads question: the Department for Infrastructure is the roads authority for Northern Ireland, and its permission is needed for anything placed in the public road or footway.

Planning in Northern Ireland sits with the councils, so for a listed building or conservation area in Portadown the planning team at Armagh City, Banbridge and Craigavon Borough Council is the one to ask before posts go in.

We hand-dig near known services, adjust positions if a vault or duct is found, and reinstate the surface to match, whether that is slabs, block paving, asphalt or a sealed forecourt finish. Deep foundations need care near the building's own footings and basement walls.

  • In conservation areas or on listed buildings, ask the local planning authority whether consent is needed.
  • Leave clear gaps for wheelchairs and buggies, typically at least 1,000 mm, and keep the footway width usable, referring to Inclusive Mobility guidance.

How the job runs

Look at how a vehicle would approach

At the free site survey we look at where a vehicle could reverse from, the kerb line, the forecourt and the frontage construction. Ownership of the pavement in front of the shop is checked at the same time.

Agree the post type and positions

We agree unrated or tested posts with you, your landlord and any insurer or security adviser involved. A fixed written quote sets out the positions, foundations and reinstatement.

Reinstate the pavement

Paving, tarmac or forecourt concrete is made good flush with the base of each post, leaving no trip edges.

Specification choices

OptionDetail
Stainless or decorative coversCovers over steel cores for shopping streets and branded frontages where plain steel would look out of place.
PAS 170-1 tested bollardsTested against low-speed vehicle impacts and suited to ram-raid risks where a tested product is requested.
Removable postsLockable removable positions allow deliveries, shopfitting or shutter maintenance without leaving the frontage open permanently.

What moves the price in Portadown

When we price ram-raid bollards in Portadown, these make the biggest difference:

  • Number of posts across the frontage or ATM
  • Reinstatement of forecourt or natural stone surfaces
  • Out-of-hours working to avoid closing the shop

Keeping them working

Ram-raid bollards are robust but not maintenance-free. Check them after any knock, because a post that has been hit may have cracked its foundation even if it still looks straight.

We can also service, repair or replace existing posts anywhere in Portadown.

Questions about ram-raid bollards in Portadown

Can you install ram-raid bollards anywhere in Portadown?

We cover all of Portadown (BT62 and BT63) and the rest of Armagh City, Banbridge and Craigavon. We also work in Craigavon, Banbridge and Armagh.

Who gives permission for bollards on the pavement in Portadown?

In Portadown, as everywhere in Northern Ireland, public roads and footways are looked after by DfI Roads rather than the council. If a post would sit on adopted footway, that consent comes first; private forecourts and car parks are a matter for the owner.

How much do ram-raid bollards cost in Portadown?

In Portadown, typically £385–£1,445 per bollard, supplied and installed, plus VAT, with a minimum job of £925 plus VAT, using our Northern Ireland guide prices. The fixed figure comes in writing after we've seen the site.

What is PAS 170-1 and do I need it?

PAS 170-1 is a standard for testing vehicle security barriers against low-speed impacts. It suits ram-raid risks where someone has asked for tested performance, such as an insurer or security adviser. If nobody has asked for a tested product, a well-founded unrated post is often adequate.

How many bollards does a shopfront need?

Enough to leave no gap a car could pass through across the vulnerable part of the frontage. For a typical small shop that is often three to five posts, but it depends on the frontage width and where a vehicle could approach from. The survey sets the number.

Ram-raid bollards in nearby towns

More from us in Portadown

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote