Computer-generated imageAbout bollard removal jobs in Cirencester
From residential driveways, filling-station forecourts and local parades, Cirencester has plenty of places where bollard removal jobs earn their keep. Automatic and lighting bollards also need their electrical supply made safe by a qualified electrician.
We cover Cirencester's GL7 postcode district, including places such as Fairford, South Cerney, Lechlade-on-Thames and Kempsford. We also cover neighbouring Stroud (10 miles), Cheltenham (13.3 miles), Swindon (13.8 miles) and Gloucester (15.4 miles) — distances are straight-line. It sits roughly 14 miles from Swindon as the crow flies.
Key facts for this area
- Area
- Gloucestershire, England
- Highway authority
- Gloucestershire County Council (local roads)
- Planning authority
- the council for Cotswold
- Postcodes
- GL7
- Guide price
- Typically £80–£345 per post + VAT (£95–£405 inc VAT for homes); minimum job £295
- Survey
- Free, with a fixed written quote
- Nearby
- Stroud (10 mi), Cheltenham (13.3 mi), Swindon (13.8 mi), Gloucester (15.4 mi)
Common reasons for bollard removal jobs in Cirencester
Why sites in Cirencester book bollard removal jobs:
- Car park and forecourt redesigns
- Moving bollards to new positions on the same site
- Removing redundant lighting bollards
What bollard removal jobs cost in Cirencester
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £80–£185 + VAT · £95–£215 inc VAT | Post out, hole backfilled, simple surface |
| Upgraded | £155–£265 + VAT · £185–£315 inc VAT | Footing removed, tarmac or block paving reinstated |
| Premium | £235–£345 + VAT · £275–£405 inc VAT | Large footing, concrete or natural stone reinstated |
Per post removed with footing, surface made good; no regional adjustment. Guide only — the fixed price follows a survey.
Consents, ground and services in Cirencester
The highway authority for local roads in Cirencester is Gloucestershire County Council; motorways and trunk roads sit with National Highways. Bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.
If your site in Cirencester is listed or inside a conservation area, check with the local planning authority (the council for Cotswold) before choosing a finish — heritage settings often favour cast iron or painted steel over stainless.
Cables and pipes are often laid close to existing posts after they were installed, so breaking out is done carefully and services are traced first. Backfilling in compacted layers stops later settlement, which otherwise shows as a dip in the new surface.
- In conservation areas, check before removing historic bollards, as consent may be needed or retention expected.
- Consider whether removal leaves an asset or route unprotected and record the decision in your risk assessment.
What happens on site
Check consents and reasons
Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.
Make supplies safe
For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.
Backfill and reinstate
Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.
Choosing the right spec
| Option | Detail |
|---|---|
| Socket and cassette removal | Removable sockets and telescopic or semi-automatic cassettes extracted whole and the hole filled. |
| Lighting bollard removal | Supply made dead and cables terminated or removed by a qualified electrician before posts are lifted. |
| Full extraction | Post and foundation broken out, leaving clear ground for resurfacing or new works. |
What moves the price in Cirencester
Two Cirencester jobs with the same number of posts can price quite differently. The usual reasons:
- Electrical isolation and hydraulic drain-down
- Cutting off or full foundation extraction
- Number and type of bollards
Keeping them working
If foundations were left in place, record their positions on site drawings so future contractors are not surprised by buried concrete. Where cables were terminated rather than removed, record where they are and confirm with the electrician that they are dead and labelled.
For damaged or loose posts in Cirencester, repairs and replacements are priced in writing first.
Bollard removal in Cirencester: FAQs
Do you carry out bollard removal jobs in Cirencester?
We cover all of Cirencester (GL7) and the rest of Gloucestershire. We also work in Stroud, Cheltenham and Swindon.
Who gives permission for bollards on the pavement in Cirencester?
In Cirencester, work on adopted pavements and verges needs consent from Gloucestershire County Council, the local highway authority. Car parks, forecourts and other private land only need the owner's permission.
How much do bollard removal jobs cost in Cirencester?
In Cirencester, typically £80–£345 per post removed with footing, surface made good, plus VAT (£95–£405 including VAT for homeowners), with a minimum job of £295 plus VAT, using our South West guide prices. The fixed figure comes in writing after we've seen the site.
What happens to the waste?
Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.
Do we need permission to remove bollards?
Sometimes. Bollards required by a planning condition, lease, security plan or the highway authority should not be removed without checking. Historic bollards in conservation areas may also be protected.
Bollard removal in nearby towns
- Stroud (10 mi)
- Cheltenham (13.3 mi)
- Swindon (13.8 mi)
- Gloucester (15.4 mi)
- Chippenham (19.1 mi)
- Tewkesbury (20.5 mi)