Somerset · England
Bollard removal in Taunton
Local installation of bollard removal jobs in Taunton — free survey, fixed written price, and posts set to the right spacing for people and vehicles.
Computer-generated imageBollard removal in Taunton
In the town of Taunton, bollard removal jobs tend to go in at community buildings, small industrial units and schools. Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match.
We work across TA1, TA2 and TA3 — Taunton itself and places including Monkton Heathfield, Norton Fitzwarren, Bathpool and Staplegrove. Jobs in Taunton can be combined with work in Bridgwater (8.9 miles), Burnham-on-Sea (16.1 miles), Tiverton (18.6 miles) and Yeovil (21.1 miles) (straight-line distances). Bristol is around 37 miles away.
Key facts for this area
- Area
- Somerset, England
- Highway authority
- Somerset Council (local roads)
- Planning authority
- Somerset Council
- Postcodes
- TA1, TA2 and TA3
- Guide price
- Typically £80–£345 per post + VAT (£95–£405 inc VAT for homes); minimum job £295
- Survey
- Free, with a fixed written quote
- Nearby
- Bridgwater (8.9 mi), Burnham-on-Sea (16.1 mi), Tiverton (18.6 mi), Yeovil (21.1 mi)
Taunton: typical bollard removal prices
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £80–£185 + VAT · £95–£215 inc VAT | Post out, hole backfilled, simple surface |
| Upgraded | £155–£265 + VAT · £185–£315 inc VAT | Footing removed, tarmac or block paving reinstated |
| Premium | £235–£345 + VAT · £275–£405 inc VAT | Large footing, concrete or natural stone reinstated |
Per post removed with footing, surface made good; no regional adjustment. Guide only — the fixed price follows a survey.
Why Taunton sites book bollard removal jobs
Typical reasons for bollard removal jobs in Taunton:
- Removing redundant lighting bollards
- Clearing old bollards before resurfacing
- Moving bollards to new positions on the same site
Permissions and groundwork in Taunton
Somerset Council is the highway authority covering Taunton's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.
Bollards on private land often don't need planning permission, but it depends on the council's view, the height and the location; in a conservation area, next to a listed building or under an Article 4 direction, ask the local planning authority (Somerset Council) first — we flag this at survey.
Backfilling in compacted layers stops later settlement, which otherwise shows as a dip in the new surface. Where the area is being resurfaced anyway, removal is timed to happen first so the patching disappears under the new surface.
- Consider whether removal leaves an asset or route unprotected and record the decision in your risk assessment.
- Check whether the bollards were required by a planning condition, lease, security plan or the highway authority before removing them.
Installation, step by step
Check consents and reasons
Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.
Make supplies safe
For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.
Backfill and reinstate
Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.
Specification choices
| Option | Detail |
|---|---|
| Cut off below surface | Post removed at or below finished level, foundation left in place and the surface patched. Quick and low-disruption. |
| Full extraction | Post and foundation broken out, leaving clear ground for resurfacing or new works. |
| Automatic bollard decommissioning | Electrical isolation, hydraulic drain-down, cassette removal and capping of ducts. |
What affects the quote
Our South West guide prices are a starting point; the survey in Taunton firms them up. What tends to move them:
- Surface type and reinstatement
- Access, working hours and waste disposal
- Electrical isolation and hydraulic drain-down
After installation
If foundations were left in place, record their positions on site drawings so future contractors are not surprised by buried concrete. Where cables were terminated rather than removed, record where they are and confirm with the electrician that they are dead and labelled.
For damaged or loose posts in Taunton, repairs and replacements are priced in writing first.
Questions about bollard removal jobs in Taunton
Can you carry out bollard removal jobs anywhere in Taunton?
We cover all of Taunton (TA1, TA2 and TA3) and the rest of Somerset. We also work in Bridgwater, Burnham-on-Sea and Tiverton.
Who gives permission for bollards on the pavement in Taunton?
Somerset Council is the highway authority covering Taunton's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.
What's a typical price for bollard removal jobs in Taunton?
In Taunton, typically £80–£345 per post removed with footing, surface made good, plus VAT (£95–£405 including VAT for homeowners), with a minimum job of £295 plus VAT, using our South West guide prices. The fixed figure comes in writing after we've seen the site.
What happens to the waste?
Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.
Will the surface look patched after removal?
On block paving it can be nearly invisible, as the blocks are relaid. Tarmac, resin and concrete usually show a patch, especially on older weathered surfaces. Timing removal before resurfacing avoids that.