Kent · England
Bollard repairs in Gillingham
Bollard repairs for sites in Gillingham and the rest of Kent, by crews working under our management.
Computer-generated imageGillingham bollard repairs
We carry out bollard repairs throughout Gillingham, typically for college campuses, leisure centres and industrial estates. Typical repairs include re-bedding a loose or leaning post, re-fixing a base plate with new anchors, replacing a seized socket, lock, cap or hinge, clearing a blocked cassette and renewing reflective bands.
We cover Gillingham's ME7, ME8 and ME3 postcode districts, including places such as Lower Twydall, Capstone, Kemsley Street and Lower Rainham. We also cover neighbouring Chatham (1.1 miles), Rochester (1.9 miles), Strood (3.1 miles) and Gravesend (8.5 miles) — distances are straight-line.
Key facts for this area
- Area
- Kent, England
- Highway authority
- Medway Council (local roads)
- Planning authority
- Medway Council
- Postcodes
- ME7, ME8 and ME3
- Guide price
- Typically £125–£475 per visit + VAT (£145–£565 inc VAT for homes)
- Survey
- Paid visit, price confirmed in writing first
Gillingham: typical bollard repair prices
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £125–£265 + VAT · £145–£315 inc VAT | Straighten or re-bed one post |
| Upgraded | £225–£375 + VAT · £265–£445 inc VAT | Several posts, or new socket, lock or band |
| Premium | £335–£475 + VAT · £395–£565 inc VAT | Larger repair with new foundation |
Per visit, typically one to three posts; +6% for South East. Guide only — the visit price is confirmed in writing first.
Common reasons for bollard repairs in Gillingham
Typical reasons for bollard repairs in Gillingham:
- Fold-down posts with bent hinges or broken locks
- Telescopic posts that will not lower or lock
- Lost keys and mismatched locks across a site
Before we dig in Gillingham
In Gillingham, work on adopted pavements and verges needs consent from Medway Council, the local highway authority. Car parks, forecourts and other private land only need the owner's permission.
Many private-land installations in Gillingham need no planning application, but the rules don't clearly cover bollards, so listed buildings, conservation areas and prominent frontages are worth raising with the planning team at Medway Council before posts go in.
Many repairs are really foundation repairs. Base-plate repairs depend on the slab: if the concrete has cracked or crumbled around the anchors, it is cut back and repaired before new fixings go in.
- On heritage bollards in conservation areas, repair and reset rather than replace where the conservation officer expects it.
- Make damaged posts safe promptly, as a leaning post or open socket on a footway is a trip hazard.
From survey to handover
Receive a written price
We confirm the cost of the visit and the expected work in writing before anyone attends. Nothing is done until you have agreed it.
Carry out the repair
The crew carries out the agreed work. If they find something different, such as a cracked slab under a base plate, they stop and we price the extra work in writing before continuing.
Record and hand back
The repaired posts are checked, the surface is made good and photographs are sent so you have a record for your maintenance file.
Choosing the right spec
| Option | Detail |
|---|---|
| Caps, hinges and bands | Replacement caps and heads, hinge pins or assemblies on fold-down posts, and new reflective bands. |
| Locks and keys | Replacement cylinders, padlocks and keys, including keyed-alike sets across a site. |
| New sockets | Replacing seized, crushed or loose sockets for removable bollards, set flush with a working lid. |
What affects the quote
When we price bollard repairs in Gillingham, these make the biggest difference:
- Type of repair and number of posts
- Whether foundations or slabs need breaking out
- Availability of matching parts, locks and caps
Keeping them working
Lubricating locks a few times a year, lifting removable and telescopic posts periodically, keeping cassettes clear of grit, touching up chipped paint and checking for lean after knocks will prevent many of them. Keep a record of bollard types, suppliers, key numbers and colours on site, so a repair can be quoted and matched quickly when it is needed.
For damaged or loose posts in Gillingham, repairs and replacements are priced in writing first.
Common questions
Do you carry out bollard repairs in Gillingham?
We cover all of Gillingham (ME7, ME8 and ME3) and the rest of Kent. We also work in Chatham, Rochester and Strood.
Who gives permission for bollards on the pavement in Gillingham?
Medway Council is the highway authority covering Gillingham's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.
How much do bollard repairs cost in Gillingham?
In Gillingham, typically £125–£475 per visit, typically one to three posts, plus VAT (£145–£565 including VAT for homeowners), using our South East guide prices. We confirm the visit price in writing before attending.
What happens if the crew finds more damage than expected?
They stop and tell you, and we price the extra work in writing. You decide whether to go ahead. Nothing beyond the agreed price is carried out without your approval.
Can you free a seized removable bollard?
Usually, by working the lock free or drilling it out, then lifting the post and cleaning the socket. If the socket is crushed or corroded, it is cut out and replaced. A new lock and keys can be fitted at the same time.
Bollard repairs in nearby towns
- Chatham (1.1 mi)
- Rochester (1.9 mi)
- Strood (3.1 mi)
- Gravesend (8.5 mi)
- Maidstone (8.6 mi)
- Sittingbourne (8.6 mi)