Bollard Installers

Kent · England

Bollard removal in Gillingham

Planning bollard removal jobs in Gillingham? We check ownership, consents and buried services first, then quote a fixed price.

Neat excavation in block paving where a bollard was removed, the old post and concrete root lying beside it, cones and barrier aroundComputer-generated image

Bollard removal in Gillingham

Removal of fixed, removable, telescopic and automatic bollards, including foundations, with the surface made good to match. In Gillingham, that tends to mean sites such as leisure centres, retail parks and supermarket frontages.

We work across ME7, ME8 and ME3 — Gillingham itself and places including Lower Twydall, Capstone, Kemsley Street and Lower Rainham. Jobs in Gillingham can be combined with work in Chatham (1.1 miles), Rochester (1.9 miles), Strood (3.1 miles) and Gravesend (8.5 miles) (straight-line distances).

Local details

Area
Kent, England
Highway authority
Medway Council (local roads)
Planning authority
Medway Council
Postcodes
ME7, ME8 and ME3
Guide price
Typically £85–£365 per post + VAT (£95–£435 inc VAT for homes); minimum job £305
Survey
Free, with a fixed written quote
Nearby
Chatham (1.1 mi), Rochester (1.9 mi), Strood (3.1 mi), Gravesend (8.5 mi)

Common reasons for bollard removal jobs in Gillingham

Typical reasons for bollard removal jobs in Gillingham:

  • Decommissioning automatic bollards that are no longer used
  • Moving bollards to new positions on the same site
  • Taking out broken stubs and empty sockets

Gillingham: typical bollard removal prices

SpecificationGuide priceIncludes
Standard£85–£205 + VAT · £95–£245 inc VATPost out, hole backfilled, simple surface
Upgraded£165–£285 + VAT · £195–£335 inc VATFooting removed, tarmac or block paving reinstated
Premium£255–£365 + VAT · £305–£435 inc VATLarge footing, concrete or natural stone reinstated

Per post removed with footing, surface made good; +6% for South East. Guide only — the fixed price follows a survey.

Permissions and groundwork in Gillingham

Medway Council is the highway authority covering Gillingham's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

Bollards on private land often don't need planning permission, but it depends on the council's view, the height and the location; in a conservation area, next to a listed building or under an Article 4 direction, ask the local planning authority (Medway Council) first — we flag this at survey.

Foundations are rarely the size anyone expects. Where the area is being resurfaced anyway, removal is timed to happen first so the patching disappears under the new surface.

  • Have automatic and lighting bollard supplies isolated and made safe by a qualified electrician.
  • Consider whether removal leaves an asset or route unprotected and record the decision in your risk assessment.

How the job runs

Survey what is in the ground

The free site survey identifies bollard types, likely foundation sizes, any power or ducts, and what the area will be used for next. You receive a fixed written quote for the agreed level of removal.

Check consents and reasons

Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.

Remove posts and foundations

Posts are cut off or extracted, foundations broken out where agreed, and sockets, cassettes and ducts removed or capped.

Finishes and options

OptionDetail
RelocationCareful removal of reusable posts and reinstallation in new positions on the same site.
Lighting bollard removalSupply made dead and cables terminated or removed by a qualified electrician before posts are lifted.
Full extractionPost and foundation broken out, leaving clear ground for resurfacing or new works.

What moves the price in Gillingham

Two Gillingham jobs with the same number of posts can price quite differently. The usual reasons:

  • Number and type of bollards
  • Access, working hours and waste disposal
  • Electrical isolation and hydraulic drain-down

After installation

Keep any keys, manuals and records from removed automatic bollards until the controller and cabling have also been dealt with, as they help an electrician confirm what was connected. After removal, keep an eye on reinstated areas for settlement over the following months, particularly where large foundations were broken out.

We can also service, repair or replace existing posts anywhere in Gillingham.

Common questions

Do you carry out bollard removal jobs in Gillingham?

We cover all of Gillingham (ME7, ME8 and ME3) and the rest of Kent. We also work in Chatham, Rochester and Strood.

Who gives permission for bollards on the pavement in Gillingham?

Medway Council is the highway authority covering Gillingham's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

What's a typical price for bollard removal jobs in Gillingham?

In Gillingham, typically £85–£365 per post removed with footing, surface made good, plus VAT (£95–£435 including VAT for homeowners), with a minimum job of £305 plus VAT, using our South East guide prices. The fixed figure comes in writing after we've seen the site.

Will the surface look patched after removal?

On block paving it can be nearly invisible, as the blocks are relaid. Tarmac, resin and concrete usually show a patch, especially on older weathered surfaces. Timing removal before resurfacing avoids that.

What happens to the waste?

Steel and iron are recycled where possible, concrete and spoil are taken away, and hydraulic fluid is disposed of properly. You are left with a clean, reinstated area.

Bollard removal in nearby towns

More from us in Gillingham

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote