Bollard Installers

London · England

Shallow-mount security bollard installation in City of London

Shallow-mount bollards for sites across City of London and the rest of London, from the first measurement to the last relaid paving block.

Line of dark grey security bollards on a pedestrianised high street with stone paving and a utility access cover beside themComputer-generated image

Shallow-mount bollards in City of London

We supply and fit shallow-mount bollards throughout City of London, typically for sites such as shopping parades, station forecourts and places of worship. Like any rated product, its performance applies only to the configuration and foundation that were tested.

Coverage in City of London takes in the EC2V, EC2R, EC2Y, EC4N, EC4M and EC4V postcode districts. Nearby, we also work in Islington (2.2 miles), Tower Hamlets (2.5 miles), Westminster (2.6 miles) and Hackney (3 miles), measured as the crow flies.

Key facts for this area

Area
London, England
Highway authority
the City of London Corporation (local roads)
Planning authority
The City of London Corporation
Postcodes
EC2V, EC2R, EC2Y, EC4N, EC4M, EC4V, EC2M and EC4R
Guide price
Typically £2,295–£10,395 per bollard + VAT; minimum job £5,745
Survey
Free, with a fixed written quote
Nearby
Islington (2.2 mi), Tower Hamlets (2.5 mi), Westminster (2.6 mi), Hackney (3 mi)

Typical shallow-mount bollards jobs in City of London

Typical reasons City of London sites choose shallow-mount bollards:

  • Podium decks, car park roofs and basement slabs
  • Sites where service diversions would be slow or impractical
  • Footways with dense utility runs just below the surface

City of London: typical shallow-mount bollard prices

SpecificationGuide priceIncludes
Standard£2,295–£5,695 + VATRated for a 7.5 t vehicle at 30 mph (48 km/h), tested foundation
Upgraded£4,695–£8,095 + VATRated for 7.5 t at 40 mph (64 km/h), tested foundation
Premium£7,145–£10,395 + VATRated for 7.5 t at 50 mph (80 km/h), or a specialist foundation

Per bollard position, supplied and installed; +15% for London. Guide only — the fixed price follows a survey.

Before we dig in City of London

the City of London Corporation is the highway authority covering City of London's local roads. Red routes are managed by Transport for London. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

If your site in City of London is listed or inside a conservation area, check with the local planning authority (The City of London Corporation) before choosing a finish — heritage settings often favour cast iron or painted steel over stainless.

Utility owners may set minimum separation distances or ask to be present when digging near their apparatus. Paving is often natural stone in the streets where these systems are used, so careful lifting, storage and relaying is part of the job.

  • Agree works and separation distances with utility owners, and with the highway authority where the line is on public highway.
  • Record the frame's position on as-built drawings so future excavation near the line can be planned safely.

What happens on site

Map what is underground

Utility records, radar scanning and trial holes establish exactly how much depth is available along the line. This is the survey that decides whether a shallow system will fit at all.

Confirm the system with the manufacturer

The survey findings go back to the manufacturer and the client's adviser to confirm the system, its layout and any end details. A fixed written quote follows the free site survey.

Cut and excavate the trench

Paving is lifted and kept for reuse where possible, and a shallow trench is excavated by hand near known services. Where a service sits higher than expected, work stops and the detail is referred back.

Finishes and options

OptionDetail
Surface-mounted rated unitsSome tested products sit on or very close to the surface with minimal digging. These are often used for temporary or semi-permanent protection and need careful checking of the surface they bear on.
Modular cassette sectionsPre-made sections joined on site, allowing short runs and changes of direction within the manufacturer's tested limits.
Linked-frame systemsPosts are welded or bolted to a continuous steel frame laid in a shallow trench and encased in concrete. Suited to straight or gently curved lines.

What affects the quote

Two City of London jobs with the same number of posts can price quite differently. The usual reasons:

  • Length of run and the system needed to achieve the rating
  • Changes of direction, end details and removable positions
  • Restricted working hours in busy streets or occupied sites

After installation

Any later utility work beside the line should be supervised so the frame is not undermined. Pay attention to the surface around the posts, because settlement or loose paving can indicate movement in the bearing layer.

For damaged or loose posts in City of London, repairs and replacements are priced in writing first.

Common questions

Can you install shallow-mount bollards anywhere in City of London?

We cover all of City of London (EC2V, EC2R, EC2Y, EC4N, EC4M and EC4V) and the rest of London. We also work in Islington, Tower Hamlets and Westminster.

Who gives permission for bollards on the pavement in City of London?

In City of London, work on adopted pavements and verges needs consent from the City of London Corporation, the local highway authority. Red routes are managed by Transport for London. Car parks, forecourts and other private land only need the owner's permission.

How much do shallow-mount bollards cost in City of London?

In City of London, typically £2,295–£10,395 per bollard position, supplied and installed, plus VAT, with a minimum job of £5,745 plus VAT, using our London guide prices. The fixed figure comes in writing after we've seen the site.

Can I install a single shallow-mount bollard on its own?

Usually not. Most shallow systems rely on several posts working together, and the rating applies to a tested run with a stated minimum number of posts. A single position generally needs a different solution.

What if a service turns out to be higher than the records show?

Work stops at that position and the finding goes back to the manufacturer and your adviser. Sometimes the frame can be adjusted within tested limits; sometimes the utility has to be lowered or the line moved. We do not improvise a change to a rated foundation on site.

Shallow-mount bollards in nearby towns

More from us in City of London

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote