Bollard Installers

Tyne and Wear · England

Automatic rising bollard installation in Felling

Automatic bollards supplied and fitted in Felling, Tyne and Wear: surveyed, scanned for services, set in proper foundations and finished to match the ground.

Stainless steel automatic rising bollard in a controlled access lane, with induction loop slots cut in the tarmac and a red and green signal on a postComputer-generated image

Automatic bollards in Felling

From high street shopfronts, filling-station forecourts and community car parks, Felling has plenty of places where automatic bollards earn their keep. Automatic bollards are available unrated for traffic control or crash-tested for security entrances.

Coverage in Felling takes in the NE10 postcode district and nearby places like Follingsby. Nearby, we also work in Gateshead (1.4 miles), Newcastle upon Tyne (2.2 miles), Hebburn (2.6 miles) and Wallsend (3 miles), measured as the crow flies.

Local details

Area
Tyne and Wear, England
Highway authority
Gateshead Council (local roads)
Planning authority
Gateshead Council
Postcodes
NE10
Guide price
Typically £2,895–£14,395 per bollard + VAT
Survey
Free, with a fixed written quote
Nearby
Gateshead (1.4 mi), Newcastle upon Tyne (2.2 mi), Hebburn (2.6 mi), Wallsend (3 mi)

What automatic bollards cost in Felling

SpecificationGuide priceIncludes
Standard£2,895–£7,695 + VATElectro-mechanical or entry hydraulic, controls, loops and photocell
Upgraded£6,345–£11,195 + VATHeavy-duty hydraulic, traffic light, signs and LED head
Premium£9,795–£14,395 + VATHigh-cycle or crash-rated automatic bollard

Per bollard, installed with controls, loops and commissioning; -4% for North East. Guide only — the fixed price follows a survey.

What Felling sites use automatic bollards for

Typical reasons Felling sites choose automatic bollards:

  • Business parks and campus roads with controlled vehicle access
  • Emergency access routes that must open on demand
  • Secure loading yards where rated automatic posts are specified

Before we dig in Felling

The highway authority for local roads in Felling is Gateshead Council; motorways and trunk roads sit with National Highways. Automatic bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.

Bollards on private land often don't need planning permission, but it depends on the council's view, the height and the location; in a conservation area, next to a listed building or under an Article 4 direction, ask the local planning authority (Gateshead Council) first — we flag this at survey.

The pit base is usually connected to a surface water drain or a soakaway, and on clay or high water table sites that connection needs particular attention. Duct routes cross the carriageway and often the footway, so buried services along those routes must be traced first.

  • Have the electrical installation carried out and certified by a qualified electrician to BS 7671.
  • On public highway, rising bollards normally need highway authority approval, with signs and signals to their requirements.

From survey to handover

Survey and risk assessment

A free site survey covers traffic patterns, who uses the entrance, power, drainage routes and buried services. We draft the safety arrangement from that, and you receive a fixed written quote.

Commission and test

Rise and fall times, loop detection, photocells, lights and the manual release are tested with vehicles present. Safety settings are recorded against the risk assessment.

Train and hand over

Site staff are shown how to lower the bollard in an emergency and how to recognise faults. You receive keys, the commissioning record and the manufacturer's manuals.

Options to consider

OptionDetail
Fail-safe behaviourConfigured to lower or stay raised on power loss, with a manual release, depending on whether access or security takes priority.
Hydraulic driveIntegral or remote power pack. Suits high-frequency entrances and heavier rated units, with periodic checks on fluid, seals and hoses.
Electro-mechanical driveMotor and gearbox inside the bollard with no hydraulic fluid. Often simpler to service, with duty cycles that suit moderate traffic.

Pricing automatic bollards in Felling

When we price automatic bollards in Felling, these make the biggest difference:

  • Hydraulic or electro-mechanical drive and the duty cycle needed
  • Length of duct runs, drainage connections and power supply distance
  • Unrated or crash-rated model and its foundation size

Keeping them working

Between visits, site staff should keep the head clear of grit and leaves, report slow or noisy movement early and never override safety devices to keep an entrance open. Automatic bollards need planned servicing, not just repair when they fail.

For damaged or loose posts in Felling, repairs and replacements are priced in writing first.

Automatic bollards in Felling: FAQs

Which parts of Felling do you cover for automatic bollards?

We cover all of Felling (NE10) and the rest of Tyne and Wear. We also work in Gateshead, Newcastle upon Tyne and Hebburn.

Do I need consent for automatic bollards on a public footway in Felling?

The highway authority for local roads in Felling is Gateshead Council; motorways and trunk roads sit with National Highways. Automatic bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.

How much do automatic bollards cost in Felling?

In Felling, typically £2,895–£14,395 per bollard, installed with controls, loops and commissioning, plus VAT, using our North East guide prices. The fixed figure comes in writing after we've seen the site.

How will emergency vehicles get through?

Usually by an agreed method such as a fire service key switch, a code, a remote handset held by the site or a free-exit arrangement. It should be agreed with the emergency services before the bollards go live.

Why do automatic bollards need drainage?

The bollard sits in a pit that collects rain and silt. Without a drain, water corrodes the mechanism, short-circuits electrics and can freeze the post in place. A drain connection is part of every automatic installation we carry out.

Automatic bollards in nearby towns

Other bollard services in Felling

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote