Bollard Installers

Tyne and Wear · England

Bollard removal in Tynemouth

Bollard removal jobs supplied and fitted in Tynemouth, Tyne and Wear: surveyed, scanned for services, set in proper foundations and finished to match the ground.

Neat excavation in block paving where a bollard was removed, the old post and concrete root lying beside it, cones and barrier aroundComputer-generated image

Bollard removal in Tynemouth

Across Tynemouth, typical sites for bollard removal jobs include high street shopfronts, small industrial units and filling-station forecourts. Posts can be cut off at or below ground level or fully extracted with their concrete.

Coverage in Tynemouth takes in the NE30 and NE29 postcode districts. Nearby, we also work in North Shields (0.9 miles), South Shields (1.4 miles), Whitley Bay (1.7 miles) and Jarrow (3.5 miles), measured as the crow flies. Newcastle upon Tyne is around 8 miles away.

Tynemouth at a glance

Area
Tyne and Wear, England
Highway authority
North Tyneside Council (local roads)
Planning authority
North Tyneside Council
Postcodes
NE30 and NE29
Guide price
Typically £75–£335 per post + VAT (£90–£395 inc VAT for homes); minimum job £275
Survey
Free, with a fixed written quote
Nearby
North Shields (0.9 mi), South Shields (1.4 mi), Whitley Bay (1.7 mi), Jarrow (3.5 mi)

Common reasons for bollard removal jobs in Tynemouth

Why sites in Tynemouth book bollard removal jobs:

  • Removing redundant lighting bollards
  • Access routes no longer needing control
  • Clearing old bollards before resurfacing

Tynemouth: typical bollard removal prices

SpecificationGuide priceIncludes
Standard£75–£185 + VAT · £90–£215 inc VATPost out, hole backfilled, simple surface
Upgraded£145–£255 + VAT · £165–£305 inc VATFooting removed, tarmac or block paving reinstated
Premium£225–£335 + VAT · £265–£395 inc VATLarge footing, concrete or natural stone reinstated

Per post removed with footing, surface made good; -4% for North East. Guide only — the fixed price follows a survey.

What we check first in Tynemouth

North Tyneside Council is the highway authority covering Tynemouth's local roads. If any post would stand on adopted highway rather than your land, that consent is the first thing we sort out.

Bollards on private land often don't need planning permission, but it depends on the council's view, the height and the location; in a conservation area, next to a listed building or under an Article 4 direction, ask the local planning authority (North Tyneside Council) first — we flag this at survey.

Foundations are rarely the size anyone expects. Where the area is being resurfaced anyway, removal is timed to happen first so the patching disappears under the new surface.

  • Have automatic and lighting bollard supplies isolated and made safe by a qualified electrician.
  • Check whether the bollards were required by a planning condition, lease, security plan or the highway authority before removing them.

From survey to handover

Check consents and reasons

Before removal, check whether the bollards were required by a planning condition, a lease, a security plan or the highway authority, and whether they protect something such as a meter or a building corner.

Make supplies safe

For automatic and lighting bollards, a qualified electrician isolates and disconnects the supply, and hydraulic units are drained.

Backfill and reinstate

Holes are backfilled in compacted layers and the surface reinstated to match, so there is no settlement or trip edge.

Choosing the right spec

OptionDetail
Socket and cassette removalRemovable sockets and telescopic or semi-automatic cassettes extracted whole and the hole filled.
Cut off below surfacePost removed at or below finished level, foundation left in place and the surface patched. Quick and low-disruption.
RelocationCareful removal of reusable posts and reinstallation in new positions on the same site.

What affects the quote

Two Tynemouth jobs with the same number of posts can price quite differently. The usual reasons:

  • Number and type of bollards
  • Electrical isolation and hydraulic drain-down
  • Surface type and reinstatement

Keeping them working

Where cables were terminated rather than removed, record where they are and confirm with the electrician that they are dead and labelled. After removal, keep an eye on reinstated areas for settlement over the following months, particularly where large foundations were broken out.

We can also service, repair or replace existing posts anywhere in Tynemouth.

Common questions

Can you carry out bollard removal jobs anywhere in Tynemouth?

We cover all of Tynemouth (NE30 and NE29) and the rest of Tyne and Wear. We also work in North Shields, South Shields and Whitley Bay.

Do I need consent for bollards on a public footway in Tynemouth?

The highway authority for local roads in Tynemouth is North Tyneside Council; motorways and trunk roads sit with National Highways. Bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.

What's a typical price for bollard removal jobs in Tynemouth?

In Tynemouth, typically £75–£335 per post removed with footing, surface made good, plus VAT (£90–£395 including VAT for homeowners), with a minimum job of £275 plus VAT, using our North East guide prices. The fixed figure comes in writing after we've seen the site.

Should bollards be cut off or fully removed?

Cut off if the area is staying as it is and nothing will be built or dug there later. Fully remove if you are resurfacing, planting or installing something new, because buried concrete gets in the way. The quote can price both.

Can automatic bollards be removed safely?

Yes, once the supply has been isolated and disconnected by a qualified electrician and any hydraulic fluid drained. The cassette is then lifted and the pit backfilled. Ducts are capped or removed.

Bollard removal in nearby towns

More from us in Tynemouth

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote