Crash-rated bollards supplied and fitted in Shirley, West Midlands: surveyed, scanned for services, set in proper foundations and finished to match the ground.
Computer-generated imageShirley crash-rated bollards
Crash-rated bollards suit plenty of Shirley sites, community car parks, filling-station forecourts and schools among them. The rating only holds when the bollard is installed to the same foundation design that was tested.
We work across B90 — Shirley itself and places including Dickens Heath, Cheswick Green, Tidbury Green and Major's Green. Nearby, we also work in Solihull (1.6 miles), Birmingham (5.9 miles), Smethwick (8.4 miles) and Redditch (9 miles), measured as the crow flies. Birmingham is around 6 miles away.
Shirley at a glance
- Area
- West Midlands, England
- Highway authority
- Solihull Council (local roads)
- Planning authority
- Solihull Council
- Postcodes
- B90
- Guide price
- Typically £1,995–£9,995 per bollard + VAT; minimum job £3,995
- Survey
- Free, with a fixed written quote
- Nearby
- Solihull (1.6 mi), Birmingham (5.9 mi), Smethwick (8.4 mi), Redditch (9 mi)
What crash-rated bollards cost in Shirley
| Specification | Guide price | Includes |
|---|---|---|
| Standard | £1,995–£5,345 + VAT | Rated for a 7.5 t vehicle at 30 mph (48 km/h), tested foundation |
| Upgraded | £4,395–£7,745 + VAT | Rated for 7.5 t at 40 mph (64 km/h), tested foundation |
| Premium | £6,795–£9,995 + VAT | Rated for 7.5 t at 50 mph (80 km/h), or a specialist foundation |
Per bollard, supplied and installed on a standard tested foundation; no regional adjustment. Guide only — the fixed price follows a survey.
Where crash-rated bollards go in around Shirley
Common uses in a place like Shirley:
- Building entrances and forecourts flagged in a security risk assessment
- Transport interchanges, taxi ranks and drop-off zones
- Sites where a vehicle dynamics assessment shows a long straight run-up
Consents, ground and services in Shirley
In Shirley, work on adopted pavements and verges needs consent from Solihull Council, the local highway authority. Car parks, forecourts and other private land only need the owner's permission.
If your site in Shirley is listed or inside a conservation area, check with the local planning authority (Solihull Council) before choosing a finish — heritage settings often favour cast iron or painted steel over stainless.
Rated foundations are large, and excavation is often where projects run into trouble. Footways and forecourts in towns are usually crowded with cables, gas mains, water pipes and old drainage, and a single unexpected duct can stop a bollard position.
- Check that the test certificate matches the exact model, configuration and foundation being installed, and keep it with the site records.
- Confirm who owns the land: works on public highway usually need the highway authority's agreement, and permanent street furniture there may need a licence.
How the job runs
Free site survey and ground checks
A free site survey looks at access, surfaces and likely services, followed by utility searches, radar scanning and trial holes where needed. You then receive a fixed written quote based on what the survey found.
Set out and excavate
Positions are set out to the drawing and excavated to the tested depth and width, with shoring where the ground needs it. Spoil is removed as work progresses.
Cure, protect and reinstate
The posts are protected while the concrete gains strength, and the surface is reinstated to match. The line should not be treated as fully effective until the specified curing period has passed.
Choosing the right spec
| Option | Detail |
|---|---|
| Decorative covers | Stainless steel, cast or polymer sleeves can be fitted over the steel core to suit a streetscape. Use covers supplied or approved by the manufacturer so the tested product is not altered. |
| Rated removable or automatic posts | Where an entrance must open for deliveries or emergency vehicles, rated removable, retractable or automatic models are available. Check that the rating stated is for the exact model and position you are buying. |
| Static rated bollards | Fixed posts for permanent lines where vehicles never need to pass. They are a straightforward rated option to install and maintain. |
What moves the price in Shirley
Two Shirley jobs with the same number of posts can price quite differently. The usual reasons:
- The rating required and the product range that achieves it
- Traffic management, restricted working hours or night work in occupied sites
- Buried services, diversions and ground investigation
After installation
A rated bollard that has stopped a vehicle has done its job and should be assessed with the manufacturer; in most cases the post, and sometimes the foundation insert, is replaced rather than straightened. Movable rated bollards need a planned servicing schedule.
For damaged or loose posts in Shirley, repairs and replacements are priced in writing first.
Common questions
Which parts of Shirley do you cover for crash-rated bollards?
We cover all of Shirley (B90) and the rest of West Midlands. We also work in Solihull, Birmingham and Smethwick.
Do I need consent for crash-rated bollards on a public footway in Shirley?
The highway authority for local roads in Shirley is Solihull Council; motorways and trunk roads sit with National Highways. Crash-rated bollards on the adopted footway are a matter for the highway authority, so we only install there with its written agreement.
How much do crash-rated bollards cost in Shirley?
In Shirley, typically £1,995–£9,995 per bollard, supplied and installed on a standard tested foundation, plus VAT, with a minimum job of £3,995 plus VAT, using our West Midlands guide prices. The fixed figure comes in writing after we've seen the site.
Why can't the foundation be adjusted to suit our ground?
Because the rating belongs to the bollard and foundation as tested together. Making the hole shallower, narrower or lighter on steel changes how the system behaves on impact. If site conditions force a change, the manufacturer has to approve it in writing, and some changes mean choosing a different product such as a shallow-mount system.
What happens if a rated bollard is struck?
Make the area safe and have the post assessed before relying on it again. A rated bollard that has absorbed a serious impact is usually replaced, and the manufacturer may need to check the foundation or insert. We can install the replacement to the original tested detail.