Bollard Installers

England · 10 towns

Shallow-mount security bollard installation in Devon

Shallow-mount bollards for sites across Devon: surveyed, quoted in writing and installed by our crews.

Line of dark grey security bollards on a pedestrianised high street with stone paving and a utility access cover beside themComputer-generated image

Shallow-mount bollards in Devon

Rated shallow-foundation bollard systems installed where buried services, basements or slabs rule out deep excavation. We cover Devon — Plymouth, Exeter, Paignton, Torquay and Newton Abbot and more.

Highway authorities for local roads in Devon: Devon County Council, Plymouth City Council and Torbay Council.

Choose your town in Devon

Guide prices in Devon

SpecificationGuide priceIncludes
Standard£1,995–£4,945 + VATRated for a 7.5 t vehicle at 30 mph (48 km/h), tested foundation
Upgraded£4,095–£7,045 + VATRated for 7.5 t at 40 mph (64 km/h), tested foundation
Premium£6,195–£8,995 + VATRated for 7.5 t at 50 mph (80 km/h), or a specialist foundation

Per bollard position, supplied and installed; no regional adjustment. Guide only — the fixed price follows a survey.

Who looks after the roads in Devon

TownHighway / roads authorityPlanning authority
PlymouthPlymouth City CouncilPlymouth City Council
ExeterDevon County Councilthe council for Exeter
PaigntonTorbay CouncilTorbay Council
TorquayTorbay CouncilTorbay Council
Newton AbbotDevon County Councilthe council for Teignbridge
ExmouthDevon County Councilthe council for East Devon
BarnstapleDevon County Councilthe council for North Devon
BidefordDevon County Councilthe council for Torridge
PlymstockPlymouth City CouncilPlymouth City Council
TivertonDevon County Councilthe council for Mid Devon

Rules for shallow-mount bollards in England

Bollards on adopted highway are a matter for the highway authority under the Highways Act 1980, so they need its written agreement. On private land the owner's agreement is what matters; listed buildings and conservation areas need a word with the planning team first. Crash ratings (ISO 22343-1, or the superseded but still accepted PAS 68 and IWA 14-1) only hold when the product is installed to its tested foundation.

Details and sources: bollard rules in England.

How installation works

Map what is underground

Utility records, radar scanning and trial holes establish exactly how much depth is available along the line. This is the survey that decides whether a shallow system will fit at all.

Confirm the system with the manufacturer

The survey findings go back to the manufacturer and the client's adviser to confirm the system, its layout and any end details. A fixed written quote follows the free site survey.

Assemble and level the frame

Frame sections are placed, joined and set to line and level, with posts fixed as the drawing shows. Joints and fixings are photographed before any concrete goes in.

Pour, cure and reinstate

Concrete is placed to the specified grade and finish depth, then the surface is rebuilt to match. The line is protected until the specified curing period has passed.

Shallow-mount bollards in Devon: FAQs

Do you cover all of Devon for shallow-mount bollards?

Yes — including Plymouth, Exeter, Paignton, Torquay, Newton Abbot, Exmouth, Barnstaple and Bideford. Enter your postcode in the price calculator to confirm.

How much do shallow-mount bollards cost in Devon?

In Devon, typically £1,995–£8,995 per bollard position, supplied and installed, plus VAT, with a minimum job of £4,995 plus VAT, using our South West guide prices. The fixed figure comes in writing after we've seen the site.

Who do I ask about bollards on public land in Devon?

For local roads, Devon County Council, Plymouth City Council and Torbay Council; National Highways covers motorways and trunk roads. Bollards on adopted highway need the highway authority's written agreement.

What if a service turns out to be higher than the records show?

Work stops at that position and the finding goes back to the manufacturer and your adviser. Sometimes the frame can be adjusted within tested limits; sometimes the utility has to be lowered or the line moved. We do not improvise a change to a rated foundation on site.

How much shallower is a shallow-mount bollard foundation?

Often a fraction of the depth of a conventional rated foundation, commonly a few hundred millimetres. The exact depth depends on the system and rating chosen. What you gain in depth is usually traded for width, because the load is spread along a linked frame.

Other services in Devon

Need bollards fitted?

Free site survey and a fixed, itemised written quote for installation work. Repairs and servicing are priced in writing before we start.

CallFree quote